Has anyone completed LA018622_Assn4_CPCCBC5009A_Ed2 for OTEN Dip. Building & Construction

LA number LA018622 Assess ment 4 , CPCCBC5009A Edition number 2 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI) , Archive v ersion 1, September 2014 CPCCBC5009A : Ass ess ment 4 W hat you have to do This Assignment relates to the following Project: 19735 Project 2 Medium Rise Apartments Job Address: 2135 The Boulevard, Strathfield, NSW Job Title : Proposed Commercial and Residential Development Client: AKM Developments Architect: Olympic Designs, 55 Olympic Pde, Homebush, NSW 2 LA number LA018622 Assessment 4, CPCCBC5009A Edition number 2 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI) , Archive v ersion 1, September 2014 You should obtain the following documents , from the OLS, for the job: Plans : Page 1 Site Plan Page 2 Basement 1 Page 3 Basement 2 Page 4 Basement 1 Setout Page 5 Basement 2 Setout Page 6 Floor Plan Level 1 Page 7 Floor Plan Level 2 Page 8 Floor Plan Level 3 Page 9 Floor Plan Level 4 Page 10 Floor Plan Level 5 Page 11 Setout Level 1 and 2 Page 12 Setout Level 3 and 4 Page 13 Setout Level 5 Page 14 South Elevation Page 15 North Elevation Page 16 East and West Elevations Bill of Quantities : Preliminary Estimate (6 pages) Specification of Works (60 pages) It is recommended that you are familiar with the following resources and standards prior to completing this assessment:  Learning Resources for CPCCBC5009A  BCA You will also need to do some of your own research to satisfactorily complete this assessment. You may m ake any assumptions you need to, but be sure to include them as part of your submission. LA number LA018622 Assess ment 4 , CPCCBC5009A Edition number 2 3 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI) , Archive v ersion 1, September 2014 Task Part A: There are four plumbing systems used throughout Australia, with some slight variations or adaptations in each State for local conditions: 1. the fully vented system 2. the modified system 3. the unvented single -stack system 4. the vented (modified) single -stack system (a variation on the single -stack system). The objectives of sanitary plumbing in this medium -rise development are as follows: 1. providing minimal amount of pipework necessary to discharge wastes from sanitary fittings quickly and quietly, whilst minimising nuisance and risk to public health 2. maintaining an adequate depth of water -seal in the traps of fittings to prevent foul air entering the building from the drainage system 3. preventing undue accumulation of foul air by encouraging air movement in the drainage system You are to design the plumbing system for this project. Include the following:  A written overview of the system you have chosen for this project (5 marks)  Justification for your decision to use this sys tem over other available systems (5 marks)  a ‘Stackwork’ diagram relating to this project. The diagram needs to be related directly to this project and not a reproduction of an existing generic diagram. (10 marks)  a water reticulation system (diagram of hot & cold water supply) (10 marks) Part B You will notice that the included plans do not include any details for services. Draw up a Lighting and Wiring Diagram for one typical floor of apartments. You should review project 1 as an example of what symbols to use. (15 marks) Part C. Prepare a report to the client on a vi able hot water system for the apartments. You should include a brief description of some alternatives. Note: you will need to do some research for this report. The following websites may help you get started. Your report should be brief (not more than 4 pa ges of text), but sufficiently informative. http://reduceyourfootprint.com.au/media/uploads/projects/attachments/Go_Solar_ Apartment s_SHW_FAQ_28_Oct_2010 -0.pdf and http://www.greenstrata.com.au/case/nexus -solar - hot -water (30 marks) 4 LA number LA018622 Assessment 4, CPCCBC5009A Edition number 2 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI) , Archive v ersion 1, September 2014 Part D Prepare a report to the client on whether to use individual ai r conditioning systems for each unit or a building wide system. Include a discussion on  the impact to the power load for each residence,  considerations for individual tenants, and  fire safety issues associated with each of the systems. (25 marks) NOTE: Any sketches included are to be to scale and can be drawn by hand (pencil or pen is acceptable) or computer generated but are to directly relate to the project and not be du plications of generic diagrams. Checklist I have:  answered all questions in the sp ace provided  clearly identified my answers  put my name and student number on my assignment  saved a copy of my assignment on my own computer