www.haya.om Waste Water Project _ Seeb Seeb Sewage Treatment Plant www.haya.om Seeb STP 3 Waste Water Project _ Seeb www.haya.om  A’Seeb Sewage Treatment Plant (STP) is a fully enclosed Waste Water Treatment Plant, and the first fully enclosed plant in Oman. This 62,000 m 3 capacity facility including four ( 04 ) pumping stations is managed by Haya Water. Out of the five( 05 ) pumping stations four( 04 ) of them (MPS -2 , MPS -3 , Al Mobellah & Al Khoud ) are located outside the STP. One pumping station (MPS -1 ) is located within STP.  Main Pumping Station 2 (MPS -2 ) and Main Pumping Station 3 (MPS -3 ) convey the collected sewage from the underground sewerage pipes to the STP and MPS -1 delivers the collected sewage to the STP. The treated effluent is distributed for irrigation purposes by Al Mabellah and Al Khoud pumping stations. Seeb STP 3 Waste Water Project _ Seeb www.haya.om Seeb STP 3 Waste Water Project _ Seeb  The Central Sewage Treatment Plant considered as the main part of the waste water treatment process. The treatment plant building includes several facilities which are designed to observe the continuous process of the plant: • Central Processing Units • W ater Testing Laboratory • Odor Treatment Unit • Chlorine Production Unit • Sludge Production Unit • Treated W ater Storage Basins • Control Rooms • Administration Offices.  TE Pumping Stations were constructed to supply the required treated water from the plant to the TE Networks. The network was connected to a set of treated water tanks to ensure the transfer of water from a low level to a higher level and to increase water flow in t he network. www.haya.om Seeb STP _ Treatment Process 3 Waste Water Project _ Seeb  Seeb STP Process consists of : • Main Pump Station 1 (MPS Pre -Treatment Unit • Secondary Treatment Unit • Tertiary Treatment Unit • Sludge Treatment Unit _ Dewatering • Odor Control Unit www.haya.om Waste Water Project _ Seeb • Wet Well Depth 15.5 m From Ground Floor . • Wet Well Size = 213 m3 • 6 Dry Well Submersible Pumps • Pump operation depends on level . • Flygt Pump 75 kW – 828 m3/ hr (19.5 mH ). • Design Flow = 4968 m3/h or 119,232 m3/day. • 2 Future Pumps to be added in Phase 2. Seeb STP _ MPS 1 3 www.haya.om Waste Water Project _ Seeb • D eposition of the large amount of organic matter and suspended solids contained in the liquid waste which includes: • Mechanical Screens: disposal of floating solids • FOG Unit: gravel and sand removal and suspended solids using primary deposition to protect station equipment. Seeb STP _ Pre -treatment Unit 3 www.haya.om Waste Water Project _ Seeb  Oxidation or transformation of organic matter into liquid wastes not deposited in the primary sedimentation ponds by air bacteria, including ventilation using surface mechanical hobbies, sludge deposition and solids through the use of final sedimentation ponds, sludge concentration and disposal by converting them into easily encapsulated materials and transport by pressure filters . Seeb STP _ Secondary Treatment Unit 3 www.haya.om Waste Water Project _ Seeb Seeb STP _ Secondary Treatment Unit 3 3. Settle 4. Draw Effluent 2. React (Aeration) TWL Screened and De -gritted Influent 5. Idle Waste Sludge • Sequence Batch Reactors (SBRs) as its core process technology. • Fully Automated Facility that uses 12 ICEAS (Intermittent Cycle Extended Aeration System) • SBR Process includes the following steps: 1) Fill 2) React (Anoxic and Aeration) 3) Settle 4) React 5) Idle 1. Anoxic Mixing (No -Aeration) www.haya.om Waste Water Project _ Seeb Seeb STP _ Secondary Treatment Unit _ SBR Components 3 • Mixers, • Diffusers, • Decanter • And SAS Pump. • Aerators • Control System www.haya.om Waste Water Project _ Seeb Seeb STP _ Secondary Treatment Unit 3 • During idle stage in the SBR Tanks, the sludge is transferred from the SBR into the AD Tank through SAS Pumps. • 6 Aerobic Digesters currently in Service and 2 will be operational as part of Phase 2. • Aerobic Digesters Steps Are:

1. Fill 2. Aeration 3. Settle 4. Decant 5. Idle • In the Buffer Tanks the sludge being aerated then transferred to centrifuges unit through Sludge Transfer Pump. www.haya.om Waste Water Project _ Seeb Seeb STP _ Tertiary Treatment Unit 3 • Purification of water from fine suspended solids through filters and the addition of chlorine to disinfect and purify water from bacteria . • The Plant equipped with Ultrafiltration System For Tertiary Treatment. • The Decanted Water From The SBR Tanks passing through The SBR Effluent Channel to the distribution chamber in The Ultrafiltration. • The Effluent Is Distributed On 2 Drum Screen with Size of 0.5 mm. • After The Drum Screen The Effluent Is Filled Into The UF Cells. • 6 UF Cells Is In Service And One More will be in operation in Phase 2. • The UF Cells equipped with Hallow Fiber Filters with pore size of 0.04 Microns. • The Effluent that passes through the filters moves to TE Tanks. • CIP and Backwash process is applied in the UF Cells for cleaning purpose. www.haya.om Waste Water Project _ Seeb Seeb STP _ Tertiary Treatment Unit 3 • The Effluent that passes through the filters moves to TE Tanks. • The Effluent is treated with Sodium Hypochlorite for Disinfection. • The Plant equipped with 2 TE Tanks : TE Naseem & TE Al Khoud /Mabella (14,224 m 3 Each). • 6 TE Pumps available and 2 more will be in operation in Phase 2. • The Plant follows standard A Treated Effluent Specification. www.haya.om Waste Water Project _ Seeb Seeb STP _ Sludge Treatment Unit 3 • In this unit, water is separated from the sludge generated by the centrifuge processing process and then sent to the Compost plant for the production of organic fertilizer . • 3 Centrifuge currently available and one more will be in operation in Phase 2. • Polymer dosed in the Centrifuge Inlet for Flocculation process. • The Centrifuge Sludge Output Is 20 -22 % Dry Solids. • The Dry Sludge Transferred to Kala Compost Plant for fertilizer production. www.haya.om Waste Water Project _ Seeb Seeb STP _ Odor Control Unit (OCU) 3 • Several units of the aromatherapy system have been installed in different areas of the project in order to ensure the creation of a suitable environment free from the impact of gases resulting from the process of wastewater treatment • The Plant Is Designed With Odor Control System To Remove Un Pleasant Odors Produced With The Process Of Sewage Collection, Sewage Transport, Pretreatment, Aerobic Digestion And Sludge Dewatering. • The Odor Control Unit Is a Wet Chemical Scrubber System. • Three Types Of Chemicals dosed into The System as below: 1) Sulfuric Acid : Ammonia Removal 2) Sodium Hypochlorite: H 2S Removal 3) Sodium Hydroxide: H 2S Removal • The Treated Gases moves to the Atmosphere. www.haya.om Waste Water Project _ Seeb  The different samples of the treatment units are collected on a daily basis and the necessary tests are carried out for the purpose of evaluating the efficiency of the treatment process and producing high quality water . Seeb STP _ Laboratory 3 www.haya.om Waste Water Project _ Seeb  The various treatment units are controlled by the control room in a manner that is equipped with sophisticated and advanced techniques that help to monitor the operation of the treatment process continuously and efficiently . Seeb STP _ Control Room (SCADA) 3 www.haya.om THANK YOU 18