Work Breakdown Structure (WBS) Checklist
These are the important aspects of the work breakdown structure (WBS) that you must consider.
Specific outputs/deliverables are related to each task.
Outputs/deliverables list is associated with performance criteria to facilitate quality monitoring. Metrics must be included if indicated
Tasks and subtasks have been broken down to their lowest levels the timeline for each should be 1 to 25 days.
Assign only one owner to the lowest level tasks to ensure accountability.
Re-review weekly and update the list; match each task to its corresponding deliverables and owner.