It is important to ensure that adequate checks, balances, and assurances are provided by corporate entities deploying software products. After examining guidance in the systems software engineering do
Is It Practical Scoring Guide
Performance Level Ratings
Meets Expectations | Performance consistently met expectations in all essential areas of the assignment criteria, at times possibly exceeding expectations, and the quality of work overall was very good. The most critical goals were met. |
Near Expectations | Performance did not consistently meet expectations. Performance failed to meet expectations in one or more essential areas of the assignment, one or more of the most critical goals were not met. |
Below Expectations | Performance was consistently below expectations in most essential areas of the assignment, reasonable progress toward critical goals was not made. Significant improvement is needed in one or more important areas. |
Criteria | Below Expectations | Near Expectations | Meets Expectations | Earned |
Software Assurance Competency Model (DHS) is clearly presented. | 0 pts – 16 pts | 17 pts – 24 pts | 25 pts | |
The student comprehensively presents his or her own practical version of SwA CorBoK, including management and HR requirements, evaluation methods, costs, and a value proposition for an organization. | 0 pts – 16 pts | 17 pts – 24 pts | 25 pts | |
The student clearly presents a rationale for each aspect of his or her own practical version of the SwA CorBoK with extensive details. | 0 pts – 16 pts | 17 pts – 24 pts | 25 pts | |
Prose is largely free of mechanical errors. The writer uses a variety of effective sentence structures, figures of speech, and industry terminology. | 0 pts – 6 pts | 7 pts – 9 pts | 10 pts | |
TOTAL | /85 | |||
Instructor Feedback |
© 2018. Grand Canyon University. All Rights Reserved.