Problem 9-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four com

Problem 9-17

Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.

Problem 9-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four com 1

Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows:

Problem 9-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four com 2

  1. Formulate and solve a linear programming model for this make-or-buy application. How many of each component should be manufactured and how many should be purchased? If required, round your answers to one decimal place.

    Let

    FM = number of frames manufactured

    FP = number of frames purchased

    SM = number of supports manufactured

    SP = number of supports purchased

    TM = number of straps manufactured

    TP = number of straps purchased

  2. Min

    fill in the blank 1FM

    fill in the blank 2FP

    fill in the blank 3SM

    fill in the blank 4SP

    fill in the blank 5TM

    fill in the blank 6TP

    s.t.

    3.5FM

    fill in the blank 7SM

    fill in the blank 8TM

    fill in the blank 9

    fill in the blank 10FM

    1.7SM

    fill in the blank 11

    fill in the blank 12FM

    fill in the blank 13SM

    1.7TM

    fill in the blank 14

    FM

    fill in the blank 15FP

    fill in the blank 16

    SM

    fill in the blank 17SP

    fill in the blank 18

    TM

    fill in the blank 19TP

    fill in the blank 20


  3. FM, FP, SM, SP, TM, TP ≥ 0.

    Manufacture

    Purchase

    Frames

    fill in the blank 21

    fill in the blank 22

    Supports

    fill in the blank 23

    fill in the blank 24

    Straps

    fill in the blank 25

    fill in the blank 26

  4. What is the total cost of the manufacturing and purchasing plan? When required, round your answer to the nearest dollar.
    $  fill in the blank 27

  5. How many hours of production time are used in each department?

    Department

    Hours of production
    time used

    Cutting

    fill in the blank 28 hours

    Milling

    fill in the blank 29 hours

    Shaping

    fill in the blank 30 hours

  6. How much should Frandec be willing to pay for an additional hour of time in the shaping department?
    $  fill in the blank 31

  7. Another manufacturer has offered to sell frames to Frandec for $45 each. Could Frandec improve its position by pursuing this opportunity?
     
    Why or why not?
    The input in the box below will not be graded, but may be reviewed and considered by your instructor.