Project Management Conveyor belt

SNHU IT 625 4-2 Activity: Conveyor Belt Case Study, Part 1

Project Description-Conveyor Belt Case Study, Part 1

The new computer-controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within <1 millimeter. The project will produce a new system for future installations, and for replacement of those in the field, at a low cost. The computer-controlled conveyor belt has the potential to be a critical unit in 30 percent of the systems installed in factories. The new system is also easier to update with future technologies.

The Project Priority Matrix for the Conveyor Belt Project (CBP) is:

Project Management Conveyor belt 1

Assignment

1. Develop the WBS outline using the MS Project 2013.

2. Does this information (WBS) allow you to define any milestones of the project? Why or why not? What are they?

Table A2.9 has been developed for you to use in completing the project exercise.

Project Management Conveyor belt 2




2