Network/Firewall Assignment

Project Outline and Schedule


At the end of Week 4 a designated Group Member has to submit approved by all members Project Outline and Schedule.


Study Group #: Group 2

Group Project: Enterprise Secure and Not-Secure SubNetworks

  • Haymanot Ayane

  • Laura Bergstrom

  • Cierra Ching

  • Deltrick Elmore

  • Serge Fabre

  1. Project Outline


    1. Group Project description

In order to better define the appropriate levels of network security and give us a point of refernce, we have decided we will make “Beta Company” an insurance company. We have defined many technologies to explore high security. We are still researching lower security measures. We will narrow down our final topics in the next one to two weeks

    1. List of the main topics and subtopics of your Group Project presentation

Some of the technologies that have been identified for further explanation are:

  • RSA Token/VIP software

  • Multifactor authentication

  • Triple Data Encryption Standard (DES)

  • Virtual LAN (VLAN)

  • Network Segmentation

  • Firewalls

  • Data Loss Prevention (DLP)

  • Intrusion Detection Systems (IDS)

    1. Resources

  • Class notes

  • Open source material linked in weekly discussion areas for ITEC 626

  • UMUC Library

  • Technical journals

  1. Project Schedule


Week

Task

Group Member

Finalize topics/subtopics (we have identified many technologies for consideration and need to narrow it down)

All

Create high-level PowerPoint outline and assign research and slide content to individual group members.

Laura/Cierra

First drafts of slide content submitted for group review.

All

Draft review of Power Point and suggestions for edits back to individual group members.

All

Final drafts of slide content submitted. Content compiled and formatted int o a uniform presentation.

All to submit. Laura/Cierra to format.

10

Group review of presentation and content and any edits.

All

11

Final review and Power Point submission.

Laura/Cierra