CIS Project Deliverable 2

Points: 150

Project Deliverable 2: Business Requirements Document

Criteria

Unacceptable

Below 60% F

Meets Minimum Expectations

60-69% D

Fair

70-79% C

Proficient

80-89% B

Exemplary

90-100% A

Section 1: Business Requirements Document

1ai. Describe the scope and analyze how to control the scope.

Weight: 15%

Did not submit or incompletely described the scope and did not submit or incompletely analyzed how to control the scope.

Insufficiently described the scope and insufficiently analyzed how to control the scope.

Partially described the scope and partially analyzed how to control the scope.

Satisfactorily described the scope and satisfactorily analyzed how to control the scope.

Thoroughly described the scope and thoroughly analyzed how to control the scope.

1aii. Identify possible risks, constraints, and assumptions.

Weight: 20%

Did not submit or incompletely identified possible risks, constraints, and assumptions.

Insufficiently identified possible risks, constraints, and assumptions.

Partially identified possible risks, constraints, and assumptions.

Satisfactorily identified possible risks, constraints, and assumptions.

Thoroughly identified possible risks, constraints, and assumptions.

1aiii. Describe the integration with other systems and infrastructure.
Weight: 20%

Did not submit or incompletely described the integration with other systems and infrastructure.

Insufficiently described the integration with other systems and infrastructure.

Partially described the integration with other systems and infrastructure.

Satisfactorily described the integration with other systems and infrastructure.

Thoroughly described the integration with other systems and infrastructure.

1aiv. Define relevant terms that will be used throughout project.

Weight: 15%

Did not submit or incompletely defined relevant terms that will be used throughout project.

Insufficiently defined relevant terms that will be used throughout project.

Partially defined relevant terms that will be used throughout project.

Satisfactorily defined relevant terms that will be used throughout project.

Thoroughly defined relevant terms that will be used throughout project.

1b. 2 references

Weight: 5%

No references provided

Does not meet the required number of references; all references poor quality choices.

Does not meet the required number of references; some references poor quality choices.

Meets number of required references; all references high quality choices.

Exceeds number of required references; all references high quality choices.

Section 2: Revised Gantt Chart / Project Plan

2. Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Weight: 15%

Did not submit or incompletely updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Insufficiently updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Partially updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Satisfactorily updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Thoroughly updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

3. Clarity, writing mechanics, and formatting requirements

Weight: 10%

More than 8 errors present

7-8 errors present

5-6 errors present

3-4 errors present

0-2 errors present