Project Model Part 2/MS Project

BUSI 681

Case Study: Project Model Part 2 Grading Rubric

Elements

Criteria

Points Possible

Points Earned

Microsoft Project Model

The Project includes each of the required elements from the instructions (see instructions for details):

  • Saved as LastName_Project_Name

  • Overall project is first task, with info in notes.

  • Project start date with rationale.

  • At least 5 deliverables included.

  • At least 20–25 unique tasks included.

  • Hierarchy delineates deliverables and tasks.

  • Project coded in 1.1, 1.1.1, 1.2 format.

  • Duration (in days) for each task.

  • Justified time estimates for at least 5 tasks.

  • At least 3 milestones included.

  • All individual tasks and milestones linked.

  • At least 2 relationships are not Finish-to-Start.

  • At least 1 task includes lead or lag time, with rationale.

  • At least 6 human resources entered on the Resource Sheet.

  • At least half of the resources include comments.

  • Labor costs included.

  • Resources assigned to every task.

  • Over-allocation justified, if needed.

  • Project baseline set.

  • Project displayed as a network diagram.

  • Document submitted on time.

150

Total

150

Instructor’s Comments