Project Implementation Plan: Part 1
Preliminary Project Charter Worksheet CPMGT/305 Version 12 |
University of Phoenix Material
Preliminary Project Charter Worksheet
Complete this project charter worksheet according to the instructions in section 4.1 of A Guide to the Project Management Body of Knowledge.
Completed by: Learning Team A
Date: 7/22/2017
Project title: New Web Based Tool
High-level project scope ( fewer than 50 words)
A new performance management process will be created that utilizes a web-based system; providing a convenient way to document and track employee performance goals, provide regularly updated status reports, and a vehicle for managerial feedback. The system will use quantified data for salary/bonus treatment at year’s end.
Problem to be solved or opportunity to be realized by this project (fewer than 25 words)
The new performance management system will provide an efficient way to quantify employee performance; providing a fairer, more accurate system for performance appraisals.
Project purpose or justification including specific measurable business impacts or results (fewer than 50 words)
The new performance management system is needed because of the lack of accuracy in past employee performance reviews and merit increases. The new system will provide both qualitative and quantitative data metric data, which will result in providing more precise analysis of employee work performance.
Measurable project objectives and related success criteria including metrics (Provide three to four objectives with metrics)
Determine which performance measuring criteria should be implemented into the new system, and describe how the system utilizes it.
Develop performance management system platform
Integrate system into company website
Achieve increased employee performance of at least 15% within 12 months of implementation.
High-level requirements (fewer than 100 words)
The performance management system project will require a hand-selected project team with extensive background in human resources and supervisory management. Two human resource clerks will participate, in addition to a single project manager. The team will also require the services of a software development consultant and her team of two software engineers. The project will be staged in a small suite of offices on the third-floor of the downtown Seattle office. The project will require the purchase of a new web server, and dedicated internet connection during preliminary stages prior to implementation in a production environment.
High-level risks (fewer than 100 words)
Some high-level risks include: developmental delays, scope creep, excessive change requests, technical difficulties, lack of employee enthusiasm for new performance system.
Summary of high-level milestones schedule (identify the major deliverables and subtasks)
Develop Employee Performance Grading System
Analyze industry standards, averages
Create methodology for quantifying performance goals/results
Develop template for employee performance status reports
Create grading matrix for salary/bonus criteria
Develop software platform for Performance Grading System
Develop outline for software development
Create software for Performance Grading System
Pilot test group prior to production rollout
Work out bugs, smooth out feature set
Implementation
Company Intranet Integration
Implement Performance Management software into Web space
Develop supervisor feedback system that integrates with PMS
Test and Troubleshoot
Pilot software platform/web site
Full implementation
Summary of high-level budget including expense dollars, capital dollars, and headcount (identify costs for major deliverables and tasks identified in the preceding milestone schedule)
Deliverables | Estimated Cost | Due Date |
DEVELOP FUNCTIONAL SPECIFICATIONS | Labor Costs = $7,200 | September 9th, 2017 |
DEVELOP SYSTEM ARCHITECTURE | Labor Costs = $7,000 | October 15th, 2017 |
DEVELOP PRELIMANARY DESIGN SPECIFICATIONS | Labor Costs = $4,500 | October 18th, 2017 |
DEVELOP DETAILED DESIGN SPECIFICATIONS | Labor Costs = $1,100 | November 15th, 2017 |
DEVELOP COMPONENTS | Labor Costs = $600 | August 22th, 2017 |
PROCURE SOFTWARE | Labor Costs = $7,200 | March 28, 2017 |
DEVELOPMENT ACCEPTANCE TEST PACKAGE | Labor Costs = $1,680 | June 6th, 2018 |
PERFORM UNIT/INTEGRATION TEST | Labor Costs = $7,000 | July 6th, 2018 |
INSTALL SYSTEM | Labor Costs = $3,200 | July 10th, 2018 |