Allocate the resources with the assigned constraints Create a baseline project Analyze crashing critical project tasks in order to shorten the duration of the porject and decrease the total cost.

Class Project

Resource and Cost Assignment

Assign the following resources to the project:

Task

Duration

M (hrs)

O (hrs)

E (hrs)

P (hrs)

Select and order equipment

120

240

120

Receive Equipment

320

320

Install and set up equipment

160

480

Finalize bill of material

160

80

Order component parts

80

80

120

Receive component parts

200

200

first production run

240

480

Finalize marketing plan

320

160

Produce Magazine ads.

320

Script for TV ads.

240

Produce TV ads.

320

Begin ad campaign

480

Ship product to customers

40

80

M: Marketing; O: Operations; E: Engineering; P: Procurement; PM: Project Manager

Available Personnel and Percent of time:

Marketing: Laura (100%), Juan (50%), Lorena (50%), Henry (50%)

Operations: Bryan (100%), Miguel (50%), Chris (50%)

Engineering: Noel (100%), Adam (100%), Ellud (50%), Rodrigo (50%), Morgan (50%)

Procurement: Raymond (100%), Leonardo (50%)

Project Manager TOM

The following table shows the annual salary:

Team Member

Annual salary ($)

Laura

42,000

Juan

44,000

Lorena

44,000

Henry

46,000

Bryan

61,000

Miguel

58,000

Chris

60,000

Noel

68,000

Adam

70,000

Ellud

66,000

Rodrigo

64,000

Morgan

70,000

Raymond

40,000

Leonardo

42,000

TOM

200,000

Assign variable direct resource cost to the project assuming 2,000 working hours per year.