SURVEYING FINAL ASSIGNMENT (ROAD DESCRIPTIONS for LINES A and B)

Marking Schedule:

Total marks for this assignment 40.
Length of by-pass and T.P. Chainages 6 Marks
Answers for each section of Roads A and B – 5 Marks for each section as follows:
Horizontal Alignment 0.5; Vertical Alignment 2; Extra Surveying Work Needed 2.5 Marks
Nominating line to adopted and giving reasons 9.

Length of bypass and chainages of TPs

ROAD A
Total Length

T.P. 1 T.P. 2
T.P. 3 T.P. 4
T.P. 5 T.P. 6

ROAD B
Total Length

T.P. 1 T.P. 2
T.P. 3 T.P. 4
T.P. 5 T.P. 6

Any Results of Calculations you wish to show

Road A

Section 1: Ch 00 to T.P. 3 – the start of the 690m radius curve

Horizontal Alignment

Vertical Alignment

Extra Surveying Work Needed

Section 2: T.P. 3 to T.P. 5 – the start of the 880m radius curve

Horizontal Alignment

Vertical Alignment

Extra Surveying Work Needed

Section 3: T.P. 5 to the end of road A.

Horizontal Alignment

Vertical Alignment

Extra Surveying Work Needed

Road B

Ch 00 to T.P. 1 (the start of the 800m Horizontal Curve)

Horizontal Alignment

Vertical Alignment

Extra Surveying Work Needed

T.P. 1 to the end of road B

Horizontal Alignment

Vertical Alignment

Extra Surveying Work Needed

Line to be adopted and reasons why this decision is being made.