Surveying Assignment needs to be done asap
SURVEYING FINAL ASSIGNMENT (ROAD DESCRIPTIONS for LINES A and B)
Marking Schedule:
Total marks for this assignment 40.
Length of by-pass and T.P. Chainages 6 Marks
Answers for each section of Roads A and B – 5 Marks for each section as follows:
Horizontal Alignment 0.5; Vertical Alignment 2; Extra Surveying Work Needed 2.5 Marks
Nominating line to adopted and giving reasons 9.
Length of bypass and chainages of TPs
ROAD A
Total Length
T.P. 1 T.P. 2
T.P. 3 T.P. 4
T.P. 5 T.P. 6
ROAD B
Total Length
T.P. 1 T.P. 2
T.P. 3 T.P. 4
T.P. 5 T.P. 6
Any Results of Calculations you wish to show
Road A
Section 1: Ch 00 to T.P. 3 – the start of the 690m radius curve
Horizontal Alignment
Vertical Alignment
Extra Surveying Work Needed
Section 2: T.P. 3 to T.P. 5 – the start of the 880m radius curve
Horizontal Alignment
Vertical Alignment
Extra Surveying Work Needed
Section 3: T.P. 5 to the end of road A.
Horizontal Alignment
Vertical Alignment
Extra Surveying Work Needed
Road B
Ch 00 to T.P. 1 (the start of the 800m Horizontal Curve)
Horizontal Alignment
Vertical Alignment
Extra Surveying Work Needed
T.P. 1 to the end of road B
Horizontal Alignment
Vertical Alignment
Extra Surveying Work Needed
Line to be adopted and reasons why this decision is being made.