explain the importance of carrying out the reconnaissance survey.
CONFIDENTIAL DEC 2020/SUG111/ASSIGNMENT
UNIVERSITI TEKNOLOGI MARA
ASSIGNMENT
COURSE : FUNDAMENTAL OF LAND SURVEYING COURSE CODE : SUG111
EXAMINATION : DECEMBER 2020
DURATION : 2 WEEKS
INSTRUCTION TO STUDENTS
1. This assignment consists of eight (8) questions.
2. You are required to solve this task with group member.
3. All the answers must be written in English language using computer (MS Word).
4. The assignment format must contain the following:
i) Cover page
ii) Answers
5. You may refer the material for this assignment from any books, journal and articles from any website pages.
© Hak cipta Universiti Teknologi MARA CONFIDENTIAL
CONFIDENTIAL AP/DEC 2020/SUG111/ASSIGNMENT
QUESTION 1
Geomatics Surveying is a science of collecting and analyzing geographical information, including land surveying and mapping information. There are many dicipline or branches that related with Geomatic Surveying. Based on your understanding, explain the below branches.
a) Hydrographic Survey
b) Photogrammetry
c) Engineering Survey
(15 marks)
QUESTION 2
Levelling is a measurement process to identify the different height of two or more points on the earth surface. Without the proper knowledge or equipment, some errors may occur and result in inaccurate measurements, increasing the risk of user error and project cost. Describe five (5) main errors sources that may occur during levelling process.
(10 marks)
QUESTION 3
Land surveying is basically an art and science of mapping and measuring land. The entire scope of profession is wide; it actually boils down to calculate where the land boundaries are situated. This is very important as without this service, there would not have been railroads, skyscrapers could not have been erected and neither any individual could have put fences around their yards for not intruding others land. Actually, there are many steps in land surveying procedures need to be taken before, during and after the observation. Based on your understanding of those procedures, explain the importance of carrying out the reconnaissance survey.
(10 marks)
QUESTION 4
Traverse is a method in the field of surveying to establish control networks. Traverse networks involve placing survey stations along a line or path of travel, and then using the previously points as a base for the next point. With the aid of suitable diagram, describe the meaning of traverse. (5marks)
QUESTION 5
A total station is an optical instrument commonly used in construction, surveying and civil engineering. It is useful for measuring horizontal angles, vertical angles and distance, therefore it does this by analyzing the slope between itself and a specific point. With the aid of suitable diagram, explain the steps for temporary adjustment of total station device.
(10marks)
QUESTION 6
a) An area on a map was measure 9.0cm x 5.0cm rectangular by using a ruler. If the scale is 1:100, calculate the followings:
i) True distance of area on ground in meter (m)
ii) Total area on ground in squared meter (m2)
(4 marks)
© Hak cipta Universiti Teknologi MARA CONFIDENTIAL
CONFIDENTIAL AP/DEC 2020/SUG111/ASSIGNMENT
QUESTION 7
A group of students need to transfer height from a benchmark (BM A) to a control station. Levelling survey has been carried out and the data below was obtained.
Table 1
BS | IS | FS | RISE | FALL | RL | REMARKS |
1.283 | | | | | 100.000 | BM A |
4.985 | | 1.310 | | | | CP1 |
4.330 | | 0.515 | | | | CP2 |
| 4.813 | | | | | Lamp Post |
| 4.891 | | | | | CP3 |
0.76 | | 4.650 | | | | Tree 1 |
1.115 | | 4.791 | | | | Drain |
1.227 | | 1.104 | | | | CP4 |
| 1.769 | | | | | Tree 2 |
| 1.185 | | | | | CP5 |
| | 1.331 | | | | BM A |
Based on the Table 1, calculate the following:
i) Reduced level for all change points and features using Rise and Fall method if the given reduced level for BM A is 100.000m.
ii) Arithmetic Check.
iii) Adjusted reduced level for all change points and features.
(18 marks)
© Hak cipta Universiti Teknologi MARA CONFIDENTIAL
CONFIDENTIAL AP/DEC 2020/SUG111/ASSIGNMENT
QUESTION 8
A horizontal control (traverse) was established near the Quantity Surveying Building in UiTM Seri Iskandar. Based on Table 2:
i) Sketch the traverse diagram.
ii) Calculate latitude and departure for each line.
iii) Calculate the adjusted latitude and adjusted departure of each line using bowditch method
iv) Calculate the linear misclosure of traverse accuracy.
v) Calculate all the coordinates, if the coordinate of Station 1 is given as N1000.000 and E1500.000.
vi) Calculate the traverse enclosed area in meter square (m2).
** Use the traverse adjustment form to complete the calculation
Table 2
Station | Bearing | Distance (m) |
1-2 | 3190 33’ 20” | 57.644 |
2-3 | 520 45’ 40” | 45.118 |
3-4 | 1390 34’05” | 87.239 |
4-1 | 2650 00’ 00” | 55.311 |
(28 marks)