I need a simulation run using crystal ball application. The excel and instructions are included.

  1. Run Simulation to show your 90% confidence for Total contingency duration and Total contingency cost estimation.

    • 2.1 First, you will run simulation for 90% confidence of your contingency duration

      • 2.1.1 You can use BetaPert distribution for your input assumptions.

      • 2.1.2.Define your individual risk durations as assumptions

      • 2.1.3 Define total contingency duration as Forecast

      • 2.1.4 Run simulation and show 90% confidence

    • 2.2 Repeat step #2.1 for contingency cost and show 90% confidence

  2. Submit Excel with simulation data and charts for step #2.1 and #2.2.