-
Development of a Project Cost Estimate Problem Statement and deliverables- Prepare a comprehensive quantity and cost estimate for a small commercial project (Drawings are attached). The estimate sho
$120.00
Engineering
Waiting for answer
-
Can you please help me to find a short answer for the following question in full and half wave rectifier 1. Why will Vp not be exactly equal to the peak value of the supply? 2. How much is the differ
$12.00
Engineering
Waiting for answer
-
Electrical and electronic engineering
$10.00
Engineering
Waiting for answer
-
A technical seminar report on Mobile Computing & Grid Computing. Two individual reports required for count of 7 to 9 pages. Attached a sample report on some other topic. Need as soon as possible s
$50.00
Engineering
Waiting for answer
-
the question is in the attachment below
$45.00
Engineering
Waiting for answer
-
the question is in the attachment below
$45.00
Engineering
Waiting for answer
-
the question is in the attachment
$40.00
Engineering
Waiting for answer
-
Write down journal minimum 100 words Reflect upon what I have learned so far from bible scriptures, NTBS, aviation safety program, and Twelve O'Clock High film.
$10.00
Engineering
Answered
-
Read and make brief one page powerpoint with those 3 question. April 28, 1988. Aloha Airlines Flight 243, a Boeing 737, suffered an explosive decompression caused by metal fatigue and corrosion, but
$10.00
Engineering
Waiting for answer
-
Hello, I wondering if you could help me with a timed assignment for machine elements and mechanism due tomorrow in the evening, Please let me know if you can help . Thank you.
$10.00
Engineering
Waiting for answer
-
Prepare a comprehensive quantity and cost estimate for a small commercial project (Drawings are attached). The estimate should include the following components: • Office and job overheads • Excavation
$55.00
Engineering
Waiting for answer
-
Determine the tensile design strength for W16x89 and two connected 1/4"x12 in plates, with two lines of 7/8-in diameter bolts in each flange using A 572 Grade steel with Fy=50 ksi and Fu=65 ksi as sho
$10.00
Engineering
Waiting for answer
-
Lab report using Scope. Need the report with all the calculations and the Waveforms including Pre Lab
$50.00
Engineering
Waiting for answer
-
1.18 Starting from the center of town, a car travels east for 80.0 km and then turns due south for another 192 km, at which point it runs out of gas. Determine the displacement of the stopped car from
$10.00
Engineering
Waiting for answer
-
I have some questions to be solved in specific time
$10.00
Engineering
Waiting for answer
-
The Fourier transform X (jw) of a continuous time signal x (t) is given as follows. Compute the value of x (0) without directly calculating the signal x (t) and Calculate the integrals
$10.00
Engineering
Waiting for answer
-
Prepare a comprehensive quantity and cost estimate for a small commercial project (Drawings are attached). The estimate should include the following components: • Office and job overheads • Excavation
$50.00
Engineering
Waiting for answer
-
Use the hint below to estimate all job overhead and assumed home office overhead costs for that project. Your company is interested in bidding for a commercial building project (you can choose any loc
$30.00
Engineering
Waiting for answer
-
1. Choose one of the NTSB most wanted list items from: https://www.ntsb.gov/safety/mwl/Pages/default.aspx 2. Prepare a 15-30 second briefing for class, based on: Your interest in this itemThe item ha
$10.00
Engineering
Waiting for answer
-
1. Choose one of the NTSB most wanted list items from: https://www.ntsb.gov/safety/mwl/Pages/default.aspx 2. Prepare a 15-30 second briefing for class, based on: Your interest in this itemThe item ha
$10.00
Engineering
Waiting for answer
-
1. Choose one of the NTSB most wanted list items from: https://www.ntsb.gov/safety/mwl/Pages/default.aspx 2. Prepare a 15-30 second briefing for class Friday Week 2, based on: Your interest in this i
$10.00
Engineering
Waiting for answer
-
The synchronous reacting of a three-phase cylinder-rotor synchronous generator per phase is 1.45 pu.has a negligible armature resistance. This generator is 1.05∠30o pu.connected to an infinite bar wit
$10.00
Engineering
Waiting for answer
-
power systems and transmition questions Question 1: Draw the diagram that is showing the transforming connecting to two sides of bus-bars including, HT side, LT side, CB? Question 2 What is B-C, B-S
$10.00
Engineering
Waiting for answer
-
all attached
$30.00
Engineering
Waiting for answer
-
i don't know how to solve this question from this book operation management:sustainability and supply chain management ,.12th edition ,jay heifer,barry render, and chuck minion,pearson,2016. Q4(a) in
$10.00
Engineering
Waiting for answer
-
Please solve the question
$10.00
Engineering
Waiting for answer
-
Compare and contrast Kenya`s Drinking Water Standards with EPA and EC Directive of the same
$10.00
Engineering
Waiting for answer
-
The mass in the following illustration is guided by the frictionless rail and has a mass of 40 kg. • The spring constant, , is 3000 N⁄m. • The spring is compressed sufficiently and released, such that
$10.00
Engineering
Waiting for answer
-
Calculate the output voltage Vout if Vin=sin(10^3t).
$10.00
Engineering
Waiting for answer
-
i need this prob soliton
$10.00
Engineering
Waiting for answer
-
An exothermic reaction is performed in a bioreactor, attached with a controller which is used to maintain the temperature in the bioreactor between certain limits. During a long time period, the tempe
$10.00
Engineering
Waiting for answer
-
A signal transmission system for telephone lines over microwave links consists of of FDM-SSB and FM signaling. Each of the bandlimited signals m (t) has bandwidth of W=6 KHz and modulates carrier si
$10.00
Engineering
Waiting for answer
-
I need help. It's about control systems and matlab.
$10.00
Engineering
Waiting for answer
-
Signal Processing
$80.00
Engineering
Waiting for answer
-
Engineering,Signals and Systems
$30.00
Engineering
Waiting for answer
-
Please help answer all questions in one hour! Show all work please
$60.00
Engineering
Waiting for answer
-
Quantity Takeoff of 1-10
$45.00
Engineering
Waiting for answer
-
6) a)Determine the forces in the columns if a 1200 lb baby elephant sat in the middle of the rigid beam when there were no temperature stresses present. b) Find the forces in the columns when the elep
$10.00
Engineering
Waiting for answer
-
4) WHat should the magnitude of w be in order to neutralize the compressive stress acting at point A located 6" below the top of the concrete (150 lb/ft^3) column.
$10.00
Engineering
Waiting for answer
-
3)The cantilever with a T cross-section is loaded and left to deflect under w. Later on, a wire BC of diameter (1/8)" and alpha=10*10^-6 is tied to the end B, and, allowed to cool by 60 degrees. Deter
$10.00
Engineering
Waiting for answer
-
2) Determine the force F between the top 6' long beam of the bxd=8"x12" and the bottom 11' long simply supported beam after all deflections have taken place. Given both beams are weightless.
$10.00
Engineering
Waiting for answer
-
1) Determine the forces in the highlighted members (bars GEDC are parallel to HAB)
$10.00
Engineering
Waiting for answer
-
System stability and Lyapunov
$30.00
Engineering
Waiting for answer
-
Lyapunov function question, I will appreciate the help even it is just a part
$40.00
Engineering
Waiting for answer
-
Control and Lyapunov function
$40.00
Engineering
Waiting for answer
-
when steam is dumped into a vessel contains water?
$10.00
Engineering
Waiting for answer
-
Please answer the attached file, thank you.
$10.00
Engineering
Waiting for answer
-
in the attachment below
$25.00
Engineering
Waiting for answer
-
Please help me in the final exam of ME 50105 Hybrid & Electric Transportation. Check the left link to find what this course is about. The Final exam will be started at 3:30PM on Tuesday, December
$250.00
Engineering
Waiting for answer
-
Urgent, please help
$25.00
Engineering
Waiting for answer