Answered You can hire a professional tutor to get the answer.

QUESTION

(a) Develop a landing sequence that gives priority to those aircraft with the highest cost of slack time (excess flying time multiplied by cost per...

(a) Develop a landing sequence that gives priority to those aircraft with the highest cost of slack time (excess flying time multiplied by cost per minute of flying time). For example, Flight 616's 18.75 minutes of slack time (22 - 3.25) times $300 per minute means that if Flight 616 does not land until its time is all used up, it incurs an extra flying cost of $5,625. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system.(b) Develop a sequence using SPT as a priority rule. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system.(c) Develop a third sequence using EDD (earliest due date) as a priority rule. The plane with the least amount of flying time remaining has the highest priority. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system. Calculate the total cost associated with this sequence (flow time multiplied by cost per minute of flying time for each flight).(d) Try to develop an alternative sequence that lands all of the aircraft safely and reduces the total cost.
Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question