Answered You can hire a professional tutor to get the answer.
" Joshua Simms has recently been placed in charge of purchasingat the Med-Tech Labs, a medical testing laboratory. Hisjob is to purchase testing...
" Joshua Simms has recently been placed in charge of purchasingat the Med-Tech Labs, a medical testing laboratory. Hisjob is to purchase testing equipment and supplies. Med-Techcurrently has a contract with a reputable supplier in the industry.Joshua’s job is to design an appropriate acceptance samplingplan for Med-Tech. The contract with the supplier states thatthe acceptable quality level is 1% defective. Also, the lot toleranceproportion defective is 4%, the producer’s risk is 5%, andthe consumer’s risk is 10%.(a) Develop an acceptance sampling plan for Joshua that meets the stated criteria, and draw the OC curve for the plan you developed.