11. Exercise 2-14 Computing Predetermined Overhead Rates and Job Costs [LO2-1, LO2-2, LO2-3, LO2-7] Moody Corporation uses a job-order costing system...
11. Exercise 2-14 Computing Predetermined Overhead Rates and Job Costs [LO2-1, LO2-2, LO2-3, LO2-7]
Moody Corporation uses a job-order costing system with a plantwide overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:
Machine-hours required to support estimated production 155,000 Fixed manufacturing overhead cost$654,000 Variable manufacturing overhead cost per machine-hour$4.60
Required:1.Compute the predetermined overhead rate. (Do not round intermediate calculations. Round your answer to 2 decimal places.)
2.During the year, Job 400 was started and completed. The following information was available with respect to this job:
Direct materials requisitioned$360 Direct labor cost$260 Machine-hours used 39
Compute the total manufacturing cost assigned to Job 400. (Do not round intermediate calculations and round final answer to 2 decimal places.)