Answered You can hire a professional tutor to get the answer.
2 COURSE PROJECT GOAL Identification of Problems/Tasks: - Understand the problems presented - Provide appropriate information with associated...
2
COURSE
PROJECT
GOAL
Identification of Problems/Tasks:
-
Understand the problems presented
-
Provide appropriate information with associated objective
evidence
Analysis:
-
Evaluate and provide relevant impact of the problems presented
-
Provide responses using information from quantitative measures as derived from
software tool results
Solutions and Recommendations:
-
Provide solution to task/problems presente
d along with any associated action
plans
PROJECT INSTRUCTIONS
Use the project response
Word document
posted in doc sharing
and begin to respond
to all
questions
Be sure and address each question/request in detail
providing emphasis on project objectives
All graphs/charts/tables are to be produced in the native format (excel, project, etc.) and
then copied into the response area of the Word document
Post
BOTH
the Word document with all responses/graphs/charts/tables AND the objective
evidence (the native documents from where you copied the charts/graphs/tables)
Project Start Date:
7 J
une
2018
Project Due Date:
2 July
2018
GRADING CRITERIA
Cover
all points in the response. Use the Word document posted as the template for all
responses and task work. The Word document will be the formal response back to Astin
Martin Graphics. All tables, graphics,
and
figures created by other tools should be
c
opie
d
and pasted in the Word document maintaining a professional appearance with
3
appropriate labeling of all figures, diagrams, tables, artifacts pasted.
As this is a
professional document, do not leave template examples in your submission.
Where applicable, p
rovide
clear documentation, graphics, diagrams, and tables that
help clarify any responses
.
STATEMENT OF WORK SUMMARY
RFP awarded for specific web services which will be incorporated into a web graphics
company (Astin
Martin Graphics LLC). Topical level requirements for the software were
provided. Deliverable products include:
-
Systems Engineering to provide appropriate requirements decomposition
-
Software Engineering to provide design/development/unit test of software
-
S
ystem Test Engineering to provide component and enterprise level testing
-
Quality Engineering to provide quality control through the entire development life
cycle
-
Management functions to include all primary functions (project management,
finance, planning &
scheduling, Overhead support (contracts, engineering matrix,
etc.)
Award date of May 15 and required completion date (deliverables provided) of
November 15.
Astin Martin Graphics request of planned deliverables, acceptance criteria, quality plan,
and work
breakdown structure. These items need to be provided in an acceptable time
for Astin Martin to review and approve.
Astin Martin Graphics further requests other deliverables to include final software
(source and binary) which meets all approved acceptance
criteria, associated design
documents (system and development level)
All project questions or request for project scope changes should be directed to the
Astin Martin Graphic designee (course instructor).
There is no requirement relative to project tools
used to generate the required data.
Topical requirements
include:
-
System Engineering: UML design appropriate graphic widgets to display
aeronautical expanse gauges within the technical specs guidelines for twenty
-
five
different visual aspects. Include appr
opriate level of peer review. Design should
include graphical mock
-
up of gauges.
-
System Engineering: Derive component level requirements for Software
Engineering to design, code, and unit test and System Test can provide System
and Enterprise level testing
4
-
Software Engineering: Provide appropriate level design artifacts from System
Engineering UML design artifacts. Include appropriate level of peer review.
-
Software Engineering: Code and Unit Test software modules that execute the
software which meets all to
pical and derived requirements
-
System Test Engineering: Derive sell
-
off acceptance criteria. Include appropriate
peer review (including System Engineering) and customer approval.
-
System Test Engineering: Derive System and Enterprise Level Test Cases.
Inclu
de appropriate level of peer review.
-
System Test Engineering: Execute test cases as software modules become
available
-
Quality Engineering: Provide quality checks during the processes described for
System Engineering, Software Engineering, and System Test E
ngineering as
appropriate
-
Include the following customer related reviews: Design Review (after System
Engineering completes design artifacts), Pre
-
Ship Review (provided prior to Astin
Martin Graphics acceptance of software), and Final Acceptance Test (soft
ware
demonstration at customer facility showing software meets all requirements as
installed)
Approved labor rates as follows:
-
System Engineer I: 43.15
-
System Engineer II: 48.37
-
System Engineer III: 51.17
-
Lead System Engineer: 58.91
-
Software Engineer I: 41
.38
-
Software Engineer II: 47.62
-
Software Engineer III: 51.01
-
Lead Software Engineer: 59.83
-
System Test Engineer I: 40.78
-
System Test Engineer II: 43.7
9
-
System Test Engineer III: 49.25
-
Lead System Test Engineer: 51.25
-
Quality Engineer I: 40.38
-
Quality Engin
eer II: 47.55
-
Quality Engineer III: 51.01
-
Lead Quality Engineer: 59.83
-
Project Manager: 91.22 (LOE
-
Level of Effort
)
-
Chief Engineer: 72.41 (LOE
-
Level of Effort
)
Approved
overhead
rates as follows:
-
Finance: 7.6
% of total hours
-
Planning & Scheduling: 6.2
%
of total hours
-
Management (Contracts/Senior Management): 2.1% of total hours
-
Facility: 1.
3
% of total hours
-
HR/Staffing: 0.54
% of total hours
5
ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG
2.1 Select Layout
System Engineering: Create outline of UML
design.
Software Engineering: Assist system engineering.
Quality Engineering: Provide quality checks
2.2 Design Graphics
System Engineering: Design appropriate graphic widgets to display aeronautical
expanse gauges within the technical specs guidelines fo
r twenty
-
five different visual
aspects. Include appropriate level of peer review.
Software Engineering: Assist system engineering.
Quality Engineering: Provide quality checks.
2.3 Approve design
System Engineering: Derive component level requirements fo
r Software Engineering to
design, code, and unit test and System Test can provide System and Enterprise level
testing.
Software Engineering: Assist system engineering
System Test Engineering: Derive sell
-
off acceptance criteria. Include appropriate peer
re
view (including System Engineering) and customer approval.
Quality Engineering: Provide quality checks.
3.1 Write content
System Engineering: Assist software engineering
Software Engineering: Code and Unit Test software modules that execute the software
which meets all topical and derived requirements.
Quality Engineering: Provide quality checks.
6
3.2 Approve content
System Engineering: Assist software engineering
Software Engineering: Provide appropriate level design artifacts from System
Engineering
UML design artifacts. Include appropriate level of peer review.
System Test Engineering: Derive sell
-
off acceptance criteria. Include appropriate peer
review (including System Engineering) and customer approval.
Quality Engineering: Provide quality checks.
3.3 Insert content in pages
System Engineering: Assist software engineering
Software Engineering: Check the function
Quality Engineering: Provide quality checks.
4.1 Set up web service on test
System Engineering: Corporate with other engineers for opinio
n
Software Engineering: Corporate with other engineers for opinion
System Test Engineering: Derive System and Enterprise Level Test Cases. Include
appropriate level of peer review.
Quality Engineering: Provide quality checks.
4.2 Perform tests
System Engi
neering: Corporate with other engineers for opinion
Software Engineering: Corporate with other engineers for opinion
System Test Engineering: Execute test cases as software modules become available
Quality Engineering: Provide quality checks.
4.3 Approve
web service
System Test Engineering: Assist Quality Engineering
Quality Engineering: Quality checks during the processes described for System
Engineering, Software Engineering, and System Test Engineering as appropriate
7
Include the following customer rel
ated reviews: Design Review (after System
Engineering completes design artifacts), Pre
-
Ship Review (provided prior to Astin Martin
Graphics acceptance of software).
4.4 Set up web service on live environment
System Test Engineering: Assist Quality enginee
ring
Quality Engineering: quality checks, and Final Acceptance Test (software demonstration
at customer facility showing software meets all requirements as installed) installed)
NOTIONAL
ACTIVITY DURATION
SCHEDULE
Notional
Activity estimated Duration
The estimated total elapsed time for how long an activity will take from starts
to finish, including associated waiting time. Also referred to as activity
resource estimated or estimated activity resources.
TaskDate
15-May
25-May
5-Jun
15-Jun
25-Jun
5-Jul
15-Jul
25-Jul
5-Aug
15-Aug
25-Aug
5-Sep
15-Sep
25-Sep
5-Oct
15-Oct
25-Oct
5-Nov
15-Nov
Select Layout
Design Graphics
Approve Design
Write Content
Approve Content
Insert content into page
Set up test web service
Perform tests
Approve web service
Go live
Plan Duration
Actual Start
% Complete (beyond plan)
Baseline Schedule
8
PROJECT QUESTIONS & TASKS
1.
Provide a
project objective
associated with the Astin Martin Graphics project. Include
a list of
assumptions
about the project.
2.
What is a work breakdown structure? What is a resp
onsibility matrix?
Using the Astin
Martin project
activity list and activity duration schedule
, WBS and RAM.
Work Breakdown Structure
jQuery22405910629757134211_1529681821788?
Responsibility Assignment Matrix
???
(Example RAM
Template
)
9
3.
(Major)
Using the project start time a
nd the required completion date
and the project
activity list and activity duration schedule
,
calculate the ES, EF, LS,
and LF times and
total slack for each activity. Show results in table form. If your calculations result in a
project schedule with negative total slack, revise the project scope, activity estimated
durations, and/or sequence or dependent relationships amon
g activities to arrive at
an acceptable baseline schedule for completing the project within the required time
line. Describe (including tables) the revisions you made.
(Example Template)
10
4.
(Major)
List
all
activity costs. From the
project activity list
and activity duration
schedule
, estimate the cost of each activity. Then, determ
ine the Total Budgeted Cost
(TBC
) for the Astin Martin Graphics project.
Provide the information in table format by
month.
Objective evidence of derived costs is required for c
redit
.
Use labor and
overhead rates as provided in your derived calculations.
(Example Template)
5.
Astin Martin Graphics wants to know how JBB Software plans to employ cost
management and earned value (EV) in their project.
I
nclude an e
xpla
nation
to Astin
Mart
in Graphics why it is necessary to calculate the earned value of w
ork performed
and how you plan to execute this task
.
6.
Astin Martin Graphics is concerned about how JBB Software will manage risks.
Describe what JBB Software plans to do in order to manage
risk on the Astin Martin
Graphics project and if a risk assessment matrix will be employed and why.
Provide
appropriate level of detail in your response