QUESTION

2 COURSE PROJECT GOAL Identification of Problems/Tasks: - Understand the problems presented - Provide appropriate information with associated...

2

COURSE

PROJECT

GOAL

Identification of Problems/Tasks:

-

Understand the problems presented

-

Provide appropriate information with associated objective

evidence

Analysis:

-

Evaluate and provide relevant impact of the problems presented

-

Provide responses using information from quantitative measures as derived from

software tool results

Solutions and Recommendations:

-

Provide solution to task/problems presente

d along with any associated action

plans

PROJECT INSTRUCTIONS

Use the project response

Word document

posted in doc sharing

and begin to respond

to all

questions

Be sure and address each question/request in detail

providing emphasis on project objectives

All graphs/charts/tables are to be produced in the native format (excel, project, etc.) and

then copied into the response area of the Word document

Post

BOTH

the Word document with all responses/graphs/charts/tables AND the objective

evidence (the native documents from where you copied the charts/graphs/tables)

Project Start Date:

7 J

une

2018

Project Due Date:

2 July

2018

GRADING CRITERIA

Cover

all points in the response. Use the Word document posted as the template for all

responses and task work. The Word document will be the formal response back to Astin

Martin Graphics. All tables, graphics,

and

figures created by other tools should be

c

opie

d

and pasted in the Word document maintaining a professional appearance with

3

appropriate labeling of all figures, diagrams, tables, artifacts pasted.

As this is a

professional document, do not leave template examples in your submission.

Where applicable, p

rovide

clear documentation, graphics, diagrams, and tables that

help clarify any responses

.

STATEMENT OF WORK SUMMARY

RFP awarded for specific web services which will be incorporated into a web graphics

company (Astin

Martin Graphics LLC). Topical level requirements for the software were

provided. Deliverable products include:

-

Systems Engineering to provide appropriate requirements decomposition

-

Software Engineering to provide design/development/unit test of software

-

S

ystem Test Engineering to provide component and enterprise level testing

-

Quality Engineering to provide quality control through the entire development life

cycle

-

Management functions to include all primary functions (project management,

finance, planning &

scheduling, Overhead support (contracts, engineering matrix,

etc.)

Award date of May 15 and required completion date (deliverables provided) of

November 15.

Astin Martin Graphics request of planned deliverables, acceptance criteria, quality plan,

and work

breakdown structure. These items need to be provided in an acceptable time

for Astin Martin to review and approve.

Astin Martin Graphics further requests other deliverables to include final software

(source and binary) which meets all approved acceptance

criteria, associated design

documents (system and development level)

All project questions or request for project scope changes should be directed to the

Astin Martin Graphic designee (course instructor).

There is no requirement relative to project tools

used to generate the required data.

Topical requirements

include:

-

System Engineering: UML design appropriate graphic widgets to display

aeronautical expanse gauges within the technical specs guidelines for twenty

-

five

different visual aspects. Include appr

opriate level of peer review. Design should

include graphical mock

-

up of gauges.

-

System Engineering: Derive component level requirements for Software

Engineering to design, code, and unit test and System Test can provide System

and Enterprise level testing

4

-

Software Engineering: Provide appropriate level design artifacts from System

Engineering UML design artifacts. Include appropriate level of peer review.

-

Software Engineering: Code and Unit Test software modules that execute the

software which meets all to

pical and derived requirements

-

System Test Engineering: Derive sell

-

off acceptance criteria. Include appropriate

peer review (including System Engineering) and customer approval.

-

System Test Engineering: Derive System and Enterprise Level Test Cases.

Inclu

de appropriate level of peer review.

-

System Test Engineering: Execute test cases as software modules become

available

-

Quality Engineering: Provide quality checks during the processes described for

System Engineering, Software Engineering, and System Test E

ngineering as

appropriate

-

Include the following customer related reviews: Design Review (after System

Engineering completes design artifacts), Pre

-

Ship Review (provided prior to Astin

Martin Graphics acceptance of software), and Final Acceptance Test (soft

ware

demonstration at customer facility showing software meets all requirements as

installed)

Approved labor rates as follows:

-

System Engineer I: 43.15

-

System Engineer II: 48.37

-

System Engineer III: 51.17

-

Lead System Engineer: 58.91

-

Software Engineer I: 41

.38

-

Software Engineer II: 47.62

-

Software Engineer III: 51.01

-

Lead Software Engineer: 59.83

-

System Test Engineer I: 40.78

-

System Test Engineer II: 43.7

9

-

System Test Engineer III: 49.25

-

Lead System Test Engineer: 51.25

-

Quality Engineer I: 40.38

-

Quality Engin

eer II: 47.55

-

Quality Engineer III: 51.01

-

Lead Quality Engineer: 59.83

-

Project Manager: 91.22 (LOE

-

Level of Effort

)

-

Chief Engineer: 72.41 (LOE

-

Level of Effort

)

Approved

overhead

rates as follows:

-

Finance: 7.6

% of total hours

-

Planning & Scheduling: 6.2

%

of total hours

-

Management (Contracts/Senior Management): 2.1% of total hours

-

Facility: 1.

3

% of total hours

-

HR/Staffing: 0.54

% of total hours

5

ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG

2.1 Select Layout

System Engineering: Create outline of UML

design.

Software Engineering: Assist system engineering.

Quality Engineering: Provide quality checks

2.2 Design Graphics

System Engineering: Design appropriate graphic widgets to display aeronautical

expanse gauges within the technical specs guidelines fo

r twenty

-

five different visual

aspects. Include appropriate level of peer review.

Software Engineering: Assist system engineering.

Quality Engineering: Provide quality checks.

2.3 Approve design

System Engineering: Derive component level requirements fo

r Software Engineering to

design, code, and unit test and System Test can provide System and Enterprise level

testing.

Software Engineering: Assist system engineering

System Test Engineering: Derive sell

-

off acceptance criteria. Include appropriate peer

re

view (including System Engineering) and customer approval.

Quality Engineering: Provide quality checks.

3.1 Write content

System Engineering: Assist software engineering

Software Engineering: Code and Unit Test software modules that execute the software

which meets all topical and derived requirements.

Quality Engineering: Provide quality checks.

6

3.2 Approve content

System Engineering: Assist software engineering

Software Engineering: Provide appropriate level design artifacts from System

Engineering

UML design artifacts. Include appropriate level of peer review.

System Test Engineering: Derive sell

-

off acceptance criteria. Include appropriate peer

review (including System Engineering) and customer approval.

Quality Engineering: Provide quality checks.

3.3 Insert content in pages

System Engineering: Assist software engineering

Software Engineering: Check the function

Quality Engineering: Provide quality checks.

4.1 Set up web service on test

System Engineering: Corporate with other engineers for opinio

n

Software Engineering: Corporate with other engineers for opinion

System Test Engineering: Derive System and Enterprise Level Test Cases. Include

appropriate level of peer review.

Quality Engineering: Provide quality checks.

4.2 Perform tests

System Engi

neering: Corporate with other engineers for opinion

Software Engineering: Corporate with other engineers for opinion

System Test Engineering: Execute test cases as software modules become available

Quality Engineering: Provide quality checks.

4.3 Approve

web service

System Test Engineering: Assist Quality Engineering

Quality Engineering: Quality checks during the processes described for System

Engineering, Software Engineering, and System Test Engineering as appropriate

7

Include the following customer rel

ated reviews: Design Review (after System

Engineering completes design artifacts), Pre

-

Ship Review (provided prior to Astin Martin

Graphics acceptance of software).

4.4 Set up web service on live environment

System Test Engineering: Assist Quality enginee

ring

Quality Engineering: quality checks, and Final Acceptance Test (software demonstration

at customer facility showing software meets all requirements as installed) installed)

NOTIONAL

ACTIVITY DURATION

SCHEDULE

Notional

Activity estimated Duration

The estimated total elapsed time for how long an activity will take from starts

to finish, including associated waiting time. Also referred to as activity

resource estimated or estimated activity resources.

TaskDate

15-May

25-May

5-Jun

15-Jun

25-Jun

5-Jul

15-Jul

25-Jul

5-Aug

15-Aug

25-Aug

5-Sep

15-Sep

25-Sep

5-Oct

15-Oct

25-Oct

5-Nov

15-Nov

Select Layout

Design Graphics

Approve Design

Write Content

Approve Content

Insert content into page

Set up test web service

Perform tests

Approve web service

Go live

Plan Duration

Actual Start

% Complete (beyond plan)

Baseline Schedule

8

PROJECT QUESTIONS & TASKS

1.

Provide a

project objective

associated with the Astin Martin Graphics project. Include

a list of

assumptions

about the project.

2.

What is a work breakdown structure? What is a resp

onsibility matrix?

Using the Astin

Martin project

activity list and activity duration schedule

, WBS and RAM.

Work Breakdown Structure

jQuery22405910629757134211_1529681821788?

Responsibility Assignment Matrix

???

(Example RAM

Template

)

9

3.

(Major)

Using the project start time a

nd the required completion date

and the project

activity list and activity duration schedule

,

calculate the ES, EF, LS,

and LF times and

total slack for each activity. Show results in table form. If your calculations result in a

project schedule with negative total slack, revise the project scope, activity estimated

durations, and/or sequence or dependent relationships amon

g activities to arrive at

an acceptable baseline schedule for completing the project within the required time

line. Describe (including tables) the revisions you made.

(Example Template)

10

4.

(Major)

List

all

activity costs. From the

project activity list

and activity duration

schedule

, estimate the cost of each activity. Then, determ

ine the Total Budgeted Cost

(TBC

) for the Astin Martin Graphics project.

Provide the information in table format by

month.

Objective evidence of derived costs is required for c

redit

.

Use labor and

overhead rates as provided in your derived calculations.

(Example Template)

5.

Astin Martin Graphics wants to know how JBB Software plans to employ cost

management and earned value (EV) in their project.

I

nclude an e

xpla

nation

to Astin

Mart

in Graphics why it is necessary to calculate the earned value of w

ork performed

and how you plan to execute this task

.

6.

Astin Martin Graphics is concerned about how JBB Software will manage risks.

Describe what JBB Software plans to do in order to manage

risk on the Astin Martin

Graphics project and if a risk assessment matrix will be employed and why.

Provide

appropriate level of detail in your response

Show more