Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

2 Parts.PART 1Use your Design Document (see attachment) to guide the creation of a prototype for your integrated system.The Prototype should address the following requirements:· The prototype s

2 Parts.

PART 1

Use your Design Document (see attachment) to guide the creation of a prototype for your integrated system.

The Prototype should address the following requirements:

·       The prototype should match the overall design created in the Case Study assignment and should provide evidence that the intended design will work.

·       A basic visual interface to support navigation of the program and identify the future functionality of the application.

·       No subsystem functionality is required but stubs to connectivity points for subsystems should be identified and have the ability to perform basic functionality tests.

·       All code should be well-documented with comments.

·       The program should run without significant errors.

·       Include a document called operation.docxthat describes how to operate the application.

o   This document should provide sufficient information to allow the instructor to set up and operate the application.

o   Identify any external system requirements

o   Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application).

o   This document should also provide a summary of how the prototype shows proof-of-concept for the project.

o   Include a section called STATUSwith a summaryof the current status of your project including problems encountered and how they will be addressed.

PART 2

Create the Alpha version of project. Should address the following requirements:

·       The application should match the design created earlier (see attachment) with the exception of any changes required to address problems or conform to a revised timeline.

·       All major functionality should be operational at least at a minimal level.

·       Connections to outside components should be functioning at a basic level to prove they will work for the final version of the application.

·       The visual interface should provide access to all major functions of the application.

·       There should be a demonstrable, functional connection to the required database for the project.

·       All code should be well-documented with comments.

·       The program should run without significant errors.

·       Include a document called operation.docxthat describes how to operate the application.

o   This document should provide sufficient information to allow the instructor to set up and operate the application.

o   Identify any external system requirements

o   Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application and changes that have been made since the last submission).

o   Include a section called STATUSwith a summaryof the current status of the project including work performed since the last submission, problems encountered and how they will be addressed.

Show more
Files: A.docx
  • @
  • 1914 orders completed
ANSWER

Tutor has posted answer for $155.00. See answer's preview

$155.00

****** **** *** ******** solution *** your kind ******

Click here to download attached files: Complete Assignment.docx
Click here to download attached files: Operation Part 1.docx
Click here to download attached files: Operation Part 2.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question