Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
A bank has two sites at which checks are processed. Site 1 can process 10,000 checks per day, and site 2 can process 6,000 checks per day. The bank...
A bank has two sites at which checks are processed. Site1 can process 10,000 checks per day, and site 2 can process6,000 checks per day. The bank processes three types ofchecks: vendor, salary, and personal. The processing costper check depends on the site (see Table 11). Each day,5,000 checks of each type must be processed. Formulate abalanced transportation problem to minimize the daily costof processing checks.