QUESTION

A drainage basin has a surface area of 381 km2. The basin receives 69.2 cm of precipitation per year. Other considerations in the water budget...

A plan is proposed, whereby a principal stream in the basin will be dammed. A pipeline will be installed from the resulting reservoir to a community well outside the basin. By this plan, the community will draw 53 million liters of water per day from the reservoir. (d) Prepare a new annual water budget for the basin as a whole, anticipating the effect of the pipeline. PK##########!#0( r##########[Content_Types].xml##(###########################################################################...