Answered You can hire a professional tutor to get the answer.

QUESTION

A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The trick ski requires 8 labor-hours for fabricating and 1...

4.I am studying for my test and would like the answers completed plus and explanation so i can reference when solving similar problems. Thank you :)

A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The trick ski requires 8 labor-hoursfor fabricating and 1 labor-hour for finishing. The slalom ski requires 2 labor-hours for fabricating and 1 labor-hour forfinishing. The maximum labor-hours available per day for fabricating and finishing are 72 and 20, respectively. Find theset of feasible solutions graphically for the number of each type of ski that can be produced. If x is the number of trick skis and y is the number of slalom skis produced per day, write a system of linear inequalitiesthat indicates appropriate restraints on x and y. Write an inequality for the constraint on fabricating time. Complete the inequality below. l:||::l72 Write an inequality for the constraint on finishing time. Complete the inequality below. DE” Are any other inequalities needed? OA. Yes,x50andy50O B. No 06. Yes,x2y O D. Yes,x20andy20
Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question