Answered You can buy a ready-made answer or pick a professional tutor to order an original one.
A new control station P, is to be established from existing coordinated control stations R and S. The distances between RP and SP were measured as 3051.630 and 1980.270 m respectively. The coordinates
A new control station P, is to be established from existing coordinated control stations R and S. The distances between RP and SP were measured as 3051.630 and 1980.270 m respectively. The coordinates of station R are given as 10000.00 mE, 10000.000 mN and for station S are as 13462.560 mE and 11373.620 mN. Station P is south of station R.
Calculate:
Bearing RP
Bearing SP
Use both survey lines RP and SP to calculate coordinate station P and make sure they give you the same answer.
- @
- 9 orders completed
- ANSWER
-
Tutor has posted answer for $10.00. See answer's preview
***** *** attached files containing *** **********