QUESTION

A proposed oil pipeline will cross 16.8 miles of national forest. The width of the land needed for the pipeline is 200 feet.

A proposed oil pipeline will cross 16.8 miles of national forest. The width of the land needed for the pipeline is 200 feet. If the Forest Service charges the oil company​ $32 per​ acre, calculate the total cost.​ (1