Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
A proposed oil pipeline will cross 16.8 miles of national forest. The width of the land needed for the pipeline is 200 feet.
A proposed oil pipeline will cross 16.8 miles of national forest. The width of the land needed for the pipeline is 200 feet. If the Forest Service charges the oil company $32 per acre, calculate the total cost. (1