Answered You can buy a ready-made answer or pick a professional tutor to order an original one.
A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected fro
A shirt manufacturer buys cloth by the 100-yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected from a sample provided by the supplier.
SAMPLE 1 2 3 4 5 6 7 8 9 10
IRREGULARITIES 6 4 3 4 5 5 6 2 4 6
a. Determine the C , Sp, UCL and LCL for a c -chart with z = 2. (Leave no cells blank. Round up any negative LCL value to "0". Round your answers to 2 decimal places.)
C 4.50
Sp ?
UCL ?
LCL ?
b. Suppose the next five rolls from the supplier had two, two, five, three, and eight irregularities. Is the supplier process under control?
- Yes
- @
- 29 orders completed
- ANSWER
-
Tutor has posted answer for $10.00. See answer's preview
******** ******* **** you ***** *** ***** answwer ** the ***** **** attached always ****** ** for ****