A work breakdown structure with at least 3 levels A project schedule with at least 3 phases and at least 9 tasks At least 2 milestones People and
- A work breakdown structure with at least 3 levels
- A project schedule with at least 3 phases and at least 9 tasks
- At least 2 milestones
- People and other resources assigned to each of the tasks
- Project's overall budget
- Adjusted project tasks, schedules, and costs based on potential project risks
The format should be a Project file, PDF, or other format noted by the instructor.
You are a project manager in a small construction company in the Eastern United States called Eastern Construction Company (ECC). The company is overseeing the development of a storage building for a state road maintenance agency. Your manager, the program manager at ECC, wants you to manage the project of the storage building construction using Project. The program manager knows that you are in a class and are learning how to use Project.
The project deliverable includes the construction of a 50'x50' storage building shell. The building will have a foundation, four walls, and a roof. Electricity will be added to the building to include overhead lights and 5 outlets on each wall, for a total of 25 outlets. A 20-foot-long rollup door will be on the building. Each of the 3 other walls will have a regular door and a set of windows.