Answered You can hire a professional tutor to get the answer.
As a baseline measure for one time period, what is the labor utilization if 30 prescriptions arrive between 8 a.m. and 9 a.m. on Monday and four or
As a baseline measure for one time period, what is the labor utilization if 30 prescriptions arrive between 8 a.m. and 9 a.m. on Monday and four or five pharmacists are on duty doing all seven steps? (You do not have the data to evaluate staffing levels by hour of the day for Monday.)