Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

BSOP 334 Week 4 Lab Material Requirements Planning and Dependant Demand

This file of BSOP 334 Week 4 Lab Material Requirements Planning and Dependant Demand includes:

Chapter 12: Problems 8, 10, 12, 13 (pp. 545-547)

Oh No!, Inc., sells three models of radar detector units. It buys the three basic models (E, F, and G) from a Japanese manufacturer and adds one, two, or four lights (component D) to further differentiate the models. D is bought from a domestic producer.

Assume that you are the manager of Assembly, Inc. You have just received an order for 40 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only for this particular robot.

A firm that produces electric golf carts has just received an order for 200 carts, which must be ready for delivery at the start of week 8. Information concerning the product structure, lead times, and quantities on hand is shown in the following table. Use this information to do each of the following:

Refer to Problem 12. Assume that unusually mild weather has caused a change in the quantity and timing of orders for golf carts. The revised plan calls for 100 golf carts at the start of week 6, 100 at the start of week 8, and 100 at the start of week 9.

Show more
  • @
  • 1 order completed
ANSWER

Tutor has posted answer for $12.99. See answer's preview

$12.99

**** *** Week * *** Material ************ Planning *** Dependant ******

Click here to download attached files: BSOP 334 Week 4 Lab Material Requirements Planning and Dependant Demand.zip
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question