Question 1

 The project scope statement indicates that the client is responsible for training the people who will be using the equipment and that the project team will train the client's trainers. This is an example of:

Answer

Project objectives

Deliverables

Limits and exclusions

Technical requirements

Milestones

Question 2

If a project criterion indicates that the project must meet a specific date, that criterion is classified as

Answer

Constrained

Enhanced

Accepted

Limited

Fixed

Question 3

Scott has just been given a project that has a specific target date. After discussion with top management he finds that while the date is important the cost is more important and a slip in delivery would be acceptable if required to meet the cost targets. The target date is best classified as

Answer

Constrain

Enhance

Accept

Limit

Optional

Question 4

If a project is small or of narrow scope and does not require an elaborate system, which of the following is a good choice?

Answer

Responsibility matrix

Organization breakdown structure

Work breakdown structure

Priority matrix

Process breakdown structure

Question 5

The ability of 911 emergency systems to identify the caller's phone number and location are considered to be a

Answer

Technical requirement

Milestone

Project limit

Project exclusion

Project deliverable

Question 6

Which of the following is not one of the basic classifications of project priorities?

Answer

Profit

Cost

Time

Performance

Question 7

The tendency for the project deliverables to expand over time—usually by changing requirements, specifications, and priorities—is called:

Answer

Scope erosion

Scope creep

Project bloat

Scope enhancement

Project add-ons

Question 8

The final step in the creation of a Work Breakdown Structure is to

Answer

Code the WBS for tracking

Assign the cost account to a manager

Assign the work package to a manager

Develop the responsibility matrix

Question 9

The process of forecasting or approximating the time and cost of completing project deliverables is called

Answer

Budgeting

Predicting

Estimating

Planning

Guesstimating

Question 10

Ed is looking over the actual results of projects and comparing them to what was estimated. He notices that projects that took six months or longer to complete were noticeably more off the estimates. Which of the following factors is he recognizing?

Answer

Padding estimates

Planning horizon

Project structure

People

Organization culture

Question 11

Jose is forecasting project time and cost for constructing a new building by multiplying the total square footage by a given dollar amount. Which of the following methods is he using?

Answer

Ratio

Template

Apportion

Function point

Learning curve

Question 12

The accuracy of top-down estimates will typically be in the range of

Answer

Minus 50% to plus 50%

Minus 0% to plus 75%

Minus 20% to plus 60%

Minus 35% to plus 35%

Minus 10% to plus 30%

Question 13

Design flaws being revealed after the fact, extreme weather conditions, and accidents occurring are examples of:

Answer

Hidden interaction costs

Things going wrong on a project

Normal conditions not applying

Changes in project scope

Question 14

Project costs are typically viewed from all of the following except:

Answer

Scheduled

Sunk

Actual

Committed

Question 15

Learning curves are more likely to apply in situations where most of the costs are

Answer

Materials

Labor

Overhead

Evenly spread over materials, labor, and overhead

Question 16

The accuracy of bottom-up estimates will typically be in the range of

Answer

Minus 50% to plus 50%

Minus 0% to plus 75%

Minus 20% to plus 60%

Minus 35% to plus 35%

Minus 10% to plus 30%

Question 17

People working on prototype development needing time to interact with the design engineers after the design is completed is an example of:

Answer

Hidden interaction costs

Things going wrong on a project

Normal conditions not applying

Changes in project scope

Question 18

Which of the following can help a project manager to digest, clarify, and understand the factors leading to the selection of a specific project?

Answer

Risk matrix

Priority matrix

Responsibility matrix

Gantt chart

Contingency matrix

Question 19

 Culture is a concept that encompasses all of the following except:

Answer

Shared norms

Beliefs

Values

Economic level

Customs

Question 20

 Needs for a project could include telecommunications, transportation, power, and availability of technically skilled talent. This is an example of which of the following environmental factors?

Answer

Geographic

Infrastructure

Economic

Legal/political

Cultural

Question 21

 Concern about the local restrictions on toxic waste is classified as which of the following environmental factors?

Answer

Economic

Geographic

Legal/political

Infrastructure

Culture

Question 22

An information systems specialist reported that his performance on a project in Northern Sweden declined due to sleep deprivation during the summer months in which there was 20 hours of daylight each day. This is an example of which of the following environmental factors?

Answer

Cultural

Legal/political

Geographic

Economic

Infrastructure

Question 23

If a construction company in Dallas builds a bridge in Houston, the project would be classified as

Answer

Global

Overseas

Local

Domestic

Foreign

Question 24

 As a response to the events of September 11, 2001, the moving of personnel, materials, and equipment across international borders has created border congestion with increased costs and time. This is an example of which of the following environmental factors?

Answer

Cultural

Infrastructure

Geographic

Security

Legal/political

Question 25

If IBM built a computer system for Outback Barbie Inc. (based in Australia) at their corporate headquarters in Sydney, the project would be classified as

Answer

Global

Overseas

Local

Domestic

Foreign

Show more
  • @
  • 177 orders completed
ANSWER

Tutor has posted answer for $18.00. See answer's preview

$18.00

******** 1

*** project scope ********* indicates **** *** ****** ** responsible for ******** *** ****** *** will ** ***** *** ********* *** that *** ******* team **** train *** ************ ******** **** ** an ******* ****

*******

******* ***********

*************

****** *** ***********

********* *************

***********

******** **

If * ******* ********* ********* **** *** project **** **** * ******** date **** ********* ** ********** as

*******

************

*********

*********

********

Fixed

******** **

Scott *** **** **** ***** a ******* **** *** * specific target **** ***** ********** **** top management he ***** **** while *** **** ** ********* *** **** ** **** ********* and * slip ** delivery ***** ** ********** if ******** ** **** *** **** targets *** ****** **** ** best classified as

*******

**********

********

*******

******

*********

Question 4

If a project ** ***** ** of ****** ***** *** **** *** ******* an elaborate ****** which of *** ********* is * **** ********

*******

Responsibility matrix

************ ********* **********

Work ********* **********

******** *******

******* ********* **********

******** **

*** ability ** 911 ********* systems ** ******** *** ************ ***** number *** ******** *** ********** to be **

*******

Technical requirement

**********

******* ******

Project **********

Project ************

Question 6

***** ** the following ** not *** ** *** ***** classifications ** project priorities?

Answer

*******

*****

Time

Performance

******** 7

*** tendency for the ******* ************ ** ****** **** time—usually ** ******** ************ ************** and ******************* called:

*******

***** erosion

***** creep

******* ******

Scope ************

Project ********

******** 8

*** final **** ** the ******** of a Work Breakdown ********* ** ***

Answer

**** the *** *** tracking

****** *** cost ******* to * ********

Assign *** work ******* ** * manager

******* *** ************** *******

Question 9

*** ******* of *********** or ************* the **** *** cost ** ********** ******* ************ ** *******

*******

Budgeting

***********

Estimating

*********

**************

Question ***

** is ******* **** the ****** ******* ** ******** *** comparing **** ** **** *** ********* ** ******* **** ******** **** took *** ****** or longer ** ******** were ********** **** *** *** ********* Which ** *** ********* ******* is he *************

*******

Padding **********

******** ********

Project **********

*******

Organization culture

Question ***

**** ** *********** ******* **** *** **** *** ************ * new building by *********** the ***** square footage by * ***** ****** ****** ***** ** *** following ******* is ** *******

*******

******

*********

**********

******** ******

******** ******

******** 12

*** ******** of ******** ********* will ********* be ** *** ***** ***

Answer

***** *** ** **** ****

***** 0% to **** ****

***** 20% ** **** ****

Minus 35% ** **** 35%

Minus *** ** **** ****

******** ***

****** ***** being revealed after *** **** ******* weather conditions and ********* occurring *** examples ****

*******

Hidden interaction ******

****** ***** wrong on * ********

****** conditions *** *********

******* ** project ******

******** ***

Project ***** *** typically ****** **** *** ** *** ********* except:

Answer

Scheduled

*****

*******

Committed

******** ***

Learning ****** *** more ****** to ***** ** situations ***** **** of *** ***** ****

*******

**********

Labor

Overhead

****** ****** **** materials labor *** *********

******** ***

The ******** ** ********* ********* **** ********* ** ** *** range ***

*******

Minus *** ** **** 50%

***** 0% ** plus ****

***** *** ** plus ****

***** *** ** **** ****

***** 10% to **** ****

******** 17

****** working on ********* *********** ******* **** ** ******** **** *** design engineers ***** the ****** is ********* ** an example ****

Answer

****** *********** ******

****** ***** ***** ** a ********

****** ********** *** *********

******* ** project ******

******** ***

Which ** the ********* can **** a ******* manager to ****** ******* and understand the factors leading ** the selection ** * ******** *********

*******

Risk matrix

******** matrix

************** *******

***** ******

*********** *******

Question 19

******* ** * concept **** *********** all of *** ********* ********

Answer

****** ******

********

*******

******** ******

********

******** ***

***** *** * project ***** ******* ****************** ************** ***** *** availability ** *********** skilled ****** **** is an ******* ** ***** ** the ********* ************* *********

*******

Geographic

***************

*********

Legal/political

*********

Question ***

Concern ***** *** ***** ************ ** ***** ***** ** ********** ** ***** of *** ********* ************* *********

*******

Economic

***********

Legal/political

Infrastructure

********

******** ***

An *********** ******* ********** reported **** *** *********** ** a ******* ** ******** ****** declined *** ** sleep deprivation ****** *** summer months in ***** ***** was ** hours ** ******** **** *** **** is an example ** ***** ** *** ********* environmental *********

Answer

*********

****************

***********

*********

***************

******** ***

** * ************ company ** Dallas ****** * bridge ** ******* *** project ***** ** ********** ***

*******

*******

*********

Local

Domestic

Foreign

******** ***

** * ******** ** *** ****** ** ********* ** **** *** ****** ** ********* ********* *** ********* across ************* borders has created ****** ********** **** ********* ***** and **** This ** ** ******* ** which ** *** following ************* *********

Answer

Cultural

***************

***********

*********

Legal/political

Question ***

** IBM ***** a ******** ****** for ******* ****** Inc ****** ** Australia) ** ***** ********* headquarters in Sydney *** ******* would ** ********** ***

*******

*******

*********

******

*********

*******

Click here to download attached files: Bus517 Midterm Exam Part 2.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question