Answered You can hire a professional tutor to get the answer.
Clearly identify all alternatives (your model should evaluate three alternatives). Construct an NPW or EUAW (or EUAC) graph showing all alternatives...
$12,000
- Compute NPW of each alternative
- Generate an NPW graph with NPW on the Y-axis and interest rate on the X-axis with all alternatives on one graph (see Figure 8-6 for an example).
- Generate an EUAW graph (see figure 8-5 for an example).
- Construct a choice table for interest rates from 0% - 100%.
- Using a MARR of 15% and a rate of return analysis, which alternative, if any, should be selected?
I need help with this Excel spread sheet.
Thanks