Construction Assignment. Please this is only for those who now how to devolop a construction site logistics plan

Assignment No. 2

Each student to develop a site logistics plan

Include adjacent streets

Show building orientation on site

Prepare a project site layout and organizational plan (graphically and narratively)

At a minimum your plan should include:

· A site logistics plan for the mobilization phase of the project (from mobilization

through demolition).

· A site logistics plan for the rough-in phase of the project.

· A site logistics plan for the finishes phase of the project until substantial completion.

At a minimum you should address:

· Jobsite access to and from the worksite; for workers, occupants, public.

· Temporary facilities; utilities, offices, storage, sanitary.

· Materials handling; material movement, delivery, storage, and handling.

· Security, safety, and signage; both inside and outside.

· Communications to owner, occupants, public.

· Work sequence, policies, and procedures

No presentations in class

Since no presentations, provide a written narrative of the work sequence and complete

explanation of the plan. This narrative shall be as if you are presenting this to your client

and explaining what your plan is and defending it.

Any data not identified on the plan but included in your concept shall be defined in the

narrative.