Critical Thinking 6 (PJM350)

Option #2: Dynamic Minimum Lag & Construction Work

Give two examples of construction work (including a combination of 2 to 4 activities each) for which dynamic minimum lag (DML) would be suitable.

Your well-written paper should meet the following requirements:

  • 1-2 pages long, not including your cover and reference pages.
  • Follow APA format and format your paper according to the CSU-Global Guide to Writing & APA.Include a title page and reference page.
  • Cite a minimum of three sources in addition to the textbook and any relevant course materials. At least three sources should be academic peer-reviewed scholarly sources to support your responses.
Show more
  • @
  • 14 orders completed
ANSWER

Tutor has posted answer for $30.00. See answer's preview

$30.00

******* ******* *** ** ************ ******** *********************************************************** Dynamic ******* lag ** * recent ************ ** the ******** ******* ****** ** project scheduling *** ****** was ********* as * ******** ** *** problem the ******** ******* methods encountered *** ****** **** ******** ** ***** ******* diagrams ** *** *** show *** ******** of *** ********* ********** *** **** ***** ** ********** *** *** ******** ************ **** ****** *** ********** to ********* ** start’ ************ which ***** were ***** ********** ********** when it come to ** depth ******* calculations *** Dynamic ******* *** or (DML) came up **** a *** ******* ** ********* *** relationship ** *** Critical ******* ****** ******** *** ****** brings ***** flexibility in analyzing *** ******* progress ***** ** ** ******* giving ******* ** the order ** ********** within the ******* ** **** as *** work in ******** **** ** ***** ********* **** ******* ******* *** ** ***** **** on stagnation ******* *** ******** activities ** *** ******* ** avoid overlapping ** *** ********** ********** successor *** *********** The ******* ******* Lag method ******* *** Instance ** activity * **** precedes ******* ******** * * *** take *** of ****** ** *** ****** ************ but ******** * ****** ***** ****** ************ **** ***** Huan ***** The ******* ******* lag ****** can ** ******* in building *** ************ ******** for instance ***** ******** ******** ***** within ** * beam ****** *** concrete **** inside *** ***** *** between *** *** ********** * ******* *** ****** ****** ** ******* ** ****** ***** ******* ** avoid cracks This **** ** the projects ********** ***** ** *********** ** * *** ******* completion ** *** ***** ******** ** this **** *** ******** pouring and ******* *** the start ** *** ********* which is the removal of *** ******** ***** *********** ***** *************** ****************** * ***** Huan J ****** ************ ************** ******* ******** Networks **** * ******** *** choosing ************ ******************* S27Guo L ** Y & Cai Z ****** Minimum-latency *********** scheduling ** ******** ****** ************** of ************* ***************** ***************** * * ***** *************** * P ****** ********* optimization of ************ ******** **** *********** activity ****************** of ************ *********** *** ***************** *********

Click here to download attached files: Dynamic Minimum Lag in Construction Projects Scheduling.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question