Dana Johnson Corp. is considering adding a fourth plant to its three existing facilities in Decatur. Minneapolis. and Carbondale, Both St. Louis and...
East St. Louis $75800 is not a correct answer!
Please see a picture below for more details.
Dana Johnson Corp. is considering adding a fourth plant to its three existing facilities in Decatur. Minneapolis. and Carbondale, Both St. Louis and East St. Louis are being considered The transportation costs per unit are shownin the table. From Exlsflng PlansTo Decatur Minneapolis Carbondale DemandBlue Earth $20 $17 $21 350Ciro $25 $27 $20 200Des Moines $22 $25 $22 450Capacity 400 300 150From Proposed PlantsTo East St. Louis St. LouisBlue Earth $29 $27Ciro $30 $28Des Moines $30 $31Capacity 1 50 1 50Using the unit production costs in the following table, show which locations yield the lowest cost.Location Production Costs (5)Decatur $50Minneapolis 60Carbondale 70East St. Louis 40St. Louis 50 Comparing the total cost between St, Louis and East St. Louis, Dana Johnson Corp. should select East St. Louis with a total cost of $ (enter your response as a whole number).