Answered You can hire a professional tutor to get the answer.

QUESTION

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours.

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data:

   Total direct labor-hours 99,000Total fixed manufacturing overhead cost$544,500Variable manufacturing overhead per direct labor-hour$2.00

Recently, Job P951 was completed with the following characteristics:

   Number of units in the job 20Total direct labor-hours 100Direct materials$880Direct labor cost$9,900

The total job cost for Job P951 is closest to: (Round your intermediate calculations to 2 decimal places.)

Garrison 16e Rechecks 2017-06-22, 2017-08-01

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question