Answered You can hire a professional tutor to get the answer.

QUESTION

Execute the improve phase of the Six Sigma DMAIC project including the following:Identify means to remove the causes of defects. Confirm the key variables and quantify their effects on the critical-t

Execute the improve phase of the Six Sigma DMAIC project including the following:

  • Identify means to remove the causes of defects.
  • Confirm the key variables and quantify their effects on the critical-to-quality characteristics (CTQs).
  • Identify the maximum acceptance ranges of the key variables and a system for measuring deviations of the variables.
  • Modify the process to stay within an acceptable range.

Execute the control phase of the Six Sigma DMAIC project including the following:

  • Determine how to maintain the improvements.
  • Determine how to monitor and control improvements.
  • Put tools in place to ensure that the key variables remain within the maximum acceptance ranges under the modified process.

Utilize all analytical tools available for Six Sigma as permitted or appropriate including, but not limited to: flowcharts, run charts, Pareto charts, checksheets, cause-and-effect diagrams, opportunity flow diagram, process control charts, failure mode and effect analysis (FMEA), design of experiments (DOE) and lean tools. Students can use templates located in the text or online sources. 

Write a 1500 - 2000 word APA paper to describe your Analyze,Improve, and Control phases.

Click the Assignment Files tab to submit your assignment. 

Note: Grades are awarded based upon individual contributions to the Learning Team assignment. Each Learning Team member receives a grade based upon his/her contributions to the team assignment. Not all students may receive the same grade for the team assignment. 

Note: Congratulations! You all have now been exposed to Phase  II what is required for Yellow Belt training.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question