Feed Temperature = 230 degree celsius T Utility (Tin - Tout) = 245 degree Celsius VB / VA = 50 (V is the volumetric flow rate) Operation Days = 7000 hr Production Rate = 80000 tons / year U (W / degre
Feed Temperature = 230 degree celsius
T Utility (Tin - Tout) = 245 degree Celsius
VB / VA = 50 (V is the volumetric flow rate)
Operation Days = 7000 hr
Production Rate = 80000 tons / year
U (W / degree Celsius . m^2) = 300
conversion X = 0.99
Cl2 + C2H4 = C2h4Cl2
rA = -k[Cl2] [C2h4]
k value = 0.132 m^3 / mol.s
Pressure = 1 bar