Answered You can hire a professional tutor to get the answer.
Green VehicleInc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both...
Green VehicleInc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/30 of a day and 1/75 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $275 and $220,respectively, per vehicle sold.The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. Decision variables:T=number of trucks to be produced per day C=number of cars to be produced per day
GREEN VEHICLES INC. AUTO MANUFACTURERQuestion:Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has justopened a new factory where the C1 car and the T1 truck can both...