Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

Hazardous noise problem paper

You have been hired as a consultant to help a local machine shop solve a hazardous noise problem. The shop is 10,000 square feet in area, with 12-foot high concrete block walls, and a flat metal roof. Inside the shop are two band saws, two metal lathes, three drill presses, one milling machine, and three abrasive grinders. The six employees work at benches located throughout the shop, using a variety of pneumatic-powered hand tools and non-powered tools. A recent noise survey found sound pressure levels exceeding 100dBA in some parts of the shop. All employees were monitored for noise exposure over eight-hour workday, and the calculated TWA for noise for the employees ranged from 88dBA to 97dBA.Using the risk assessment matrix in Table 11 on page 122 in the course textbook (image attached), Conduct an initial hazard analysis and risk assessment based on the information in the scenario provided Discuss how you arrived at the risk level estimate.Determine a possible control measure for each of the six level in the hierarchy of control on page 208 (image attached) in the course textbook, and explain the reasoning behind each choice. For each of the selected control measures, reevaluate the original risk. In a summary paragraph, discuss the resuts and how the shop managers could determine which control measure would be required and which others might be beneficial to their operations.Your paper must be a minimum of two pages in length, not counting cover page and references, and follow APA formatting for the paper , as well as for all referenece and in-text citations.

Show more
Elite2
Elite2
  • @
  • 331 orders completed
ANSWER

Tutor has posted answer for $35.00. See answer's preview

$35.00

*** **** **** ***** ** * consultant to **** * ***** ******* **** ***** * hazardous noise ******* *** **** ** 10000 square **** ** **** with ******* **** ******** ***** ***** *** a **** ***** **** ****** *** **** *** *** **** saws *** metal lathes three ***** ******* *** milling ******* *** ***** ******** ******** *** *** ********* work ** ******* located ********** the **** ***** * variety ** ***************** hand ***** *** non-powered ***** A ****** ***** ****** ***** ***** ******** ****** ********* ****** ** some ***** ** *** **** All ********* were ********* for noise ******** **** ********** workday *** *** ********** TWA *** ***** for the ********* ranged from ***** ** ********** *** risk assessment ****** in ***** ** on **** 122 ** *** ****** ******** (image ********* ******* ** initial ****** analysis and **** ********** ***** on the information ** *** ******** ******** Discuss *** you ******* ** *** risk level estimateDetermine * ******** control ******* *** **** ** *** *** level ** *** hierarchy of ******* ** **** 208 ****** attached) ** the ****** ******** *** ******* *** ********* ****** **** ****** *** each ** *** ******** control ******** ********** *** ******** **** ** * ******* ********* discuss *** ****** *** *** the **** ******** ***** determine ***** control ******* ***** be ******** *** which ****** ***** be beneficial ** ***** operationsYour ***** **** ** * ******* of *** pages ** length *** counting cover page and ********** *** follow *** ********** for the paper as **** ** *** *** ********** *** in-text *********

Click here to download attached files: noise hazard.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question