Answered You can hire a professional tutor to get the answer.

QUESTION

Hi, I need help with essay on Designing Production Systems Process Selection and Capacity Planning. Paper must be at least 1000 words. Please, no plagiarized work!It also aims to discuss some practice

Hi, I need help with essay on Designing Production Systems Process Selection and Capacity Planning. Paper must be at least 1000 words. Please, no plagiarized work!

It also aims to discuss some practices that made it a better or a different manufacturing company.

Rockwell Automations Marion plant is located in the western part of North Carolina. The plant started its operations in 1996 with a total land area of 174,000 sq feet. Its major products include "mounted spherical and tapered roller bearings with shaft sizes ranging from 1 3_16 inches to 5 inches.

These bearings go into such things as mining machinery, fans and other air-handling equipment, waste treatment equipment, forest products processing equipment, food processing machinery and metals processing equipment." (John S. McClenahen)

The production floor of the plant is divided into two major areas, which has a total of 20 manufacturing cells. In the front area 16 manufacturing cells producing 351 products which comprises 80% of the plants total sales revenue. At the back are remaining 4 cells, producing items that comprise the remaining 20% of the plant's total sales revenue. This is also called the build on demand area.

To date, the company still continues to help manufacturers worldwide succeed through their industrial information control and information solutions, giving them the competitive advantage they so rightfully deserve.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question