Hi, need to submit a 2250 words paper on the topic Baseline Project Plan for GB Manufacturing Equipment Check-Out System.
Hi, need to submit a 2250 words paper on the topic Baseline Project Plan for GB Manufacturing Equipment Check-Out System. The report is a preliminary investigation of developing the Equipment Check-Out System into the business processes of GB Manufacturing, specifically the Maintenance Department Equipment Depot Section. . This project plan covers the identified problems, opportunities, management directives, and recommendations.
Outline
The baseline project plan report is written in three sections. . The first section is an investigation of the needs in developing a system that manages equipment check-in and check-out. . The second section is the evaluation of the feasibility of developing an ECS. . The last section is focused on project management issues and proposed development methodologies.
Project Investigation
Problem Statement
The equipment depot operation in the Maintenance Department of GB Manufacturing is experiencing several problems in terms of lost and stolen equipment. . It is the primary function of the equipment depot to provide the necessary equipment required by the maintenance employees. . However, the estimated amount of lost and stolen equipment exceeds $50,000 worth of tools each year. .
Alternative Solutions to the Problem
In order to address the alarming issue of losses, the management and the Maintenance Department has two options. . The first alternative involves the improvement of the existing manual system of equipment check-in and check-out where tighter controls will be implemented and penalties shall be imposed on responsible persons. . Another alternative involves the development of a new automated system that would manage the equipment check-in and check-out with emphasis on traceability of usage and timely availability of equipment.
Weighted Multi-criteria Analysis
In order to assess the significance and relevance of the alternatives, a multi-criteria analysis is created to rate both alternatives. . The alternative with the highest total score is chosen for the project.