Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

How to Cope With Project Scope

Respond to the following:

•  As the project manager, how will you ensure that the initial scope is appropriate to the project requirements and stakeholder needs? What if the scope must be modified after the project has begun? What should you do to ensure this is the only modification to the scope during the project?•  As the project progresses, issues with budget and time constraints may develop. Identify how you would handle these issues if they developed on your project.•  Whenever you work with others there is the potential for conflict. A member of your team has decided to take a “short cut” and does not complete his part with the necessary quality and durability. Using an example of your choice to demonstrate this issue, how can you resolve the issue ethically?Please reference the textbook.  
  • Schwalbe, K. (2015). An Introduction to Project Management (5th ed.). Minneapolis, MN: Schwalbe Publishing.
    • Chapter 4: Planning Projects, Part 1 (Project Integration and Scope)
    • Chapter 5: Planning Projects, Part 2 (Project Time and Cost Management)
    • PowerPoint presentations:
    • Schwalbe, K. (2015). An Introduction to Project Management (5th ed.). Minneapolis, MN: Schwalbe Publishing.
      • Chapter 4: Planning Projects, Part 1 (Project Integration and Scope)[PPTX file size 2.05 MB]
      • Chapter 5: Planning Projects, Part 2 (Project Time and Cost Management) [PPTX file size 1.66 MB]
Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question