Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

I need help creating a thesis and an outline on Final Year Professional Practice Project. Prepare this assignment according to the guidelines found in the APA Style Guide. An abstract is required.

I need help creating a thesis and an outline on Final Year Professional Practice Project. Prepare this assignment according to the guidelines found in the APA Style Guide. An abstract is required. Most of the activities which were discussed in previous modules in semester A are presented in this portfolio and how they were applied in the proposed project.

The WBJ training center building project was previously proposed and we were mandated to oversee its activities till completion. The project is supposed to incorporate building technologies which ensured that all the aspects of local authority’s documentation are met. The documentation requires any of the adopted building technology puts into consideration the use of building controls which are meant to target the efficiency of energy use through its supply and utilization. The building technology adopts maximum security systems in its designs by first through the use of building materials used (Demkin 2001). They have tested strength and durability so as to achieve the required lifespan of 50 years without failure. The site location of the project makes ease of accessibility for all the customers and its future users (Russ 2012).

The project doesn’t inconvenience the public in any way in terms of pollution and environmental issues. The building technology adopted ensures maximum utilization of materials to reduce waste and also for the waste generated in the site, it is well disposed of. The technology makes optimal use of special requirements for future expansions. This can be incorporated by adding an extra floor to the existing one or expanding the size of the rooms (March 2009).

The building technology was also very keen on the safety factor of the project. This considered another scope of site evaluation for any instabilities before any activity of the project started (Schaufelberger and Lin 2013). To ensure that the terrain and the type of soil were able to sustain the estimated weight of the building site survey was done. Then the site was cleared and excavated to remove any unwanted materials in the site.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question