Answered You can hire a professional tutor to get the answer.

QUESTION

I need help creating a thesis and an outline on The Essential Aspects of Project Management. Prepare this assignment according to the guidelines found in the APA Style Guide. An abstract is required.

I need help creating a thesis and an outline on The Essential Aspects of Project Management. Prepare this assignment according to the guidelines found in the APA Style Guide. An abstract is required. The project has an&nbsp.overall&nbsp.performance period of three hundred days, but the agreement allows for an extension of up to thirty days. The&nbsp.project’s guidelines and objectives are in the contract signed between ourselves, the Iraqi government, and the&nbsp.relevant&nbsp.fund's&nbsp.donor&nbsp.for this project. The contract outlines the hierarchical&nbsp.system&nbsp.of reporting project&nbsp.progress&nbsp.from the relevant Iraqi Ministry to the donor group. The project&nbsp.contract&nbsp.also allows for continuous monitoring of project progress by the other partners, whenever there is a need. The Chief Engineer of the Dahuk&nbsp.region&nbsp.provided the architectural designs of the project.

The scope of work for the project’s classroom construction begins with&nbsp.clearing&nbsp.and marking the site. The school is to be constructed on an unoccupied lot, donated by the Dahuk Governorate. The area&nbsp.was previously used&nbsp.for agricultural purposes thus will&nbsp.require&nbsp.digging up and removal of plants, excavation of buried non-organic materials, which may have an adverse effect on the building. In addition, there is a need to remove the upper unsuitable soil&nbsp.primarily&nbsp.made of sandy and loamy soils, before lastly. trenching&nbsp.is done&nbsp.to&nbsp.mark&nbsp.the&nbsp.school&nbsp.boundaries. The removal of unsuitable soil followed the&nbsp.compilation&nbsp.of soil test results, which showed that&nbsp.appropriate&nbsp.soil was at a depth of two meters. Digging&nbsp.was done&nbsp.to the stated point. Moreover, findings from the Global Resources Network (GRN) show that the area’s underground water rose too high heights. it is paramount to&nbsp.construct&nbsp.a filter layer to redirect water flow from the project area. Upon completion of site preparation, construction of classrooms, a&nbsp.supplementary&nbsp.building, and a generator housing&nbsp.room&nbsp.begin. Firstly. classroom&nbsp.construction&nbsp.takes center stage as it is the most critical part of the project. Ground slabs, reinforced by steel,&nbsp.are used&nbsp.in&nbsp.floor&nbsp.construction&nbsp.where trenches&nbsp.are dug&nbsp.around the proposed classroom&nbsp.perimeter&nbsp.before cages&nbsp.are laid&nbsp.in for reinforcement.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question