Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

I need these 2 questions answered for a project scope statement. I have attached the initial project proposal as well as the project that was selected.Project scope statement4. TECHNICAL REQUIREMENTS

I need these 2 questions answered for a project scope statement. I have attached the initial project proposal as well as the project that was selected. I need 150 to 200 words a peice, Thank you

Project scope statement

4.  TECHNICAL REQUIREMENTS 

5.  LIMITS AND EXCLUSIONS

. Technical requirements. More frequently than not, a product or service will have technical requirements to ensure proper performance. Technical requirement typically clarify either the deliverables or define the performance specifications. For example, a technical requirement for a personal computer might be the ability to accept 120-volt alternating current or 240-volt direct current with-out any adapters or user switches. Another well-known example is the ability of 911 emergency systems to identify the caller’s phone number and location of the phone. Examples from information systems projects include speed and capacity of database systems and connectivity with alternative systems. For understanding the importance of key requirements, see Snapshot from Practice: Big Bertha.

5. Limits and exclusions. The limits of scope should be defined. Failure to do so can lead to false expectations and to expending resources and time on the wrong problem. Examples of limits are: local air transportation to and from base camps will be outsourced; system maintenance and repair will be done only up to one month after final inspection; client will be billed for additional training beyond that prescribed in the contract. Exclusions further define the boundary of the project by stating what is not included. Examples include: data will be collected by the client, not the contractor; a house will be built, but no landscaping or security devices added; software will be installed, but no training given.

Show more
  • @
  • 5213 orders completed
ANSWER

Tutor has posted answer for $20.00. See answer's preview

$20.00

******* ***** ****************** ********************* requirements ****** **** *********** depending ** *** ********** *** nature of **** ******* Our ******* ***** the ********* ************ *** **** ***** ********* ** solve these ****** ***** ** *** ** the technical ********* needed *** **** *********** of **** ************ *** ******* labor ***** ***** ********* as *** product **** is ******** ** ****** ****** **** of ********** ***** carried *** **** ***** ** * **** *** ********* **** ** ********* ** ****** ****** *********** ** ******** *** production thee number ** ********** **** in *** current product line **** ** increased to ***** *** ****** ** the ******* **** Transportation ***** **** **** ** ******* ** ********** *** ****** ** ******** to ********* to *** stores This ***** **** ******* **** be ***** *** *********** **** ** *** ******** *** equipment ***** be increased Increasing ******* ** maintenance **** ** ***** *** ***** duties within *** shortest **** possible All ***** technical ************ **** *********** **** ensure ********* ************ ** the companyLIMITS *** **************** *** *** things that are not ********* in *** scope ********* *** ****** *** ** **** though some conditions ** ******* *** ********* ** this ***** **** ****** not * **** ************ In ********** **** *** ***** resource ********** ********** * ******* ****** of ********* will * employed *** ************ of *** ******* ***** ** ********** employees ****** *** *** ********* ******* ********** **** be ******** ******** ** *** ****** ********** ** not ********** as at *** ************ ******** ***** ** ********* ******* **** **** which ** ******** ** ** **** ** *** ******* No ******** **** be ******* ** the ********* ** update **** **** *** new technology ** this *** cost * *** *** are ******** unnecessary expensesWhen *** these factors *** assembled ******** a scope ********* is produced ***** we *** ********* objectives ************ work inclusions *** ********** ***** involve variables **** ** **** schedule ******** ********* *** technology Once *** ***** ******* are ******* understood *** ********** **** ******* *** project can ******* ** *** next ****

Click here to download attached files: Project scope statement.doc
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question