Answered You can hire a professional tutor to get the answer.
I thought the total variable cost was $24.8 and the operating income was $390,600 but apparently I am wrong.
I am having a hard time with Part B of this assignment. I thought the total variable cost was $24.8 and the operating income was $390,600 but apparently I am wrong. Could I please get some help on this assignment?