Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
In 6 minutes, a conveyor belt moves 300 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller belt moves the same quantity of cans the same distance in 18 minutes. If b
In 6 minutes, a conveyor belt moves 300 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller belt moves the same quantity of cans the same distance in 18 minutes. If both belts are used, find how long it takes to move the cans to the storage area.