Answered You can hire a professional tutor to get the answer.
In Week 7, the class examined the Joint Commission’s framework for root cause analysis of sentinel Incidents in health care organizations. For purposes of this project, a critical incident is a key
In Week 7, the class examined the Joint Commission’s framework for root cause analysis of sentinel Incidents in health care organizations. For purposes of this project, a critical incident is a key occurrence, but it is not a sentinel event. A bow-tie analysis places the critical incident at the center of the framework and identifies in graphic format the root cause leading up to the incident on the left side of the critical incident. On the right side of the incident, key preventive measures are graphically represented. In one image, you will capture the incident (at the center), the causes for failure in quality, and (on the right) preventive measures a manager can put in place to stop this failure from happening in the future. The final graphic will appear as a bow-tie. The instructor will provide an example. Each student will select a critical incident for approval by the instructor.
Formatting:
- Title Page
- 1 page (double spaced) Page should clearly articulate what the critical incident is and provide background.
- 1 page Page should include the bow-tie analysis
- Reference Page (2 references minimum)
- Written document should conform to American Psychological Association (APA) 6th Edition
The grading rubric for this assignment appears below, if you opened the Assignment in the Assignment Folder, or can be opened by clicking on the 'Written Assignment Rubric' tab in the lower right corner of the screen, if you opened the Assignment in Content.