Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

individual system analysis and design

Topic will be given after writer is assigned

The project is three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, use the MS Project software for their project schedule.

Phase 1: Requirement analysis

A. Problem definition

B. Issues

C. Objectives

D. Requirements

E. Constraints

F. Description of the proposed system

G. Logical model design

1.     Data flow diagrams

·      Context diagram

·      Diagram 0

o   Diagram 1 (Diagram 1 is optional)

·      Descriptions of processes in each diagram

2.     Descriptions of outputs/inputs/performance/security or controls

H. Specific requirements, if any (interface, operational, resource, performance, etc.)

Phase 2: System and database design

A. User interface

Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.

1.     How data will be input to the system?

·      The physical layout for each input

·      The input design and procedures

2.     How data will be output from the system?

·      The physical layout for each output

·      The output design and procedures

B. Data design

Develop a plan for data organization, storage, updating, and retrieval.

1.     Database design

·      Database tables with their attributes should be presented

·      Primary key(s) should be identified in each table, if any

·      Three steps of normalization should be included.

2.     Entity-relationship diagrams

3.     Data file storage and access

C. System architecture

Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.

Phase 3: Project plan

A list of tasks or activities needed for implementing the proposed system

Estimating completion time and costs

A project schedule for performing those activities (Gantt charts or PERT charts)

Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question